Presence of bridge piers across a stream causes constricted flow in the openings due to the decrease of width of stream owing to presence of the piers. Furthermore it creates the following problems from hydraulic point of view: 

(i)  Local scouring at the piers and bed erosion can take place. To avoid damage to the foundation of piers, a number of protective layers of stone or concrete apron could be provided around the piers.

(ii) The head loss induced by bridge piers causes the backwater effect so that water level upstream is increased. Thus this may result in flooding in upstream areas.


Related Discussions:- Effect of bridge piers across a stream

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Water control for sheet pile walls, Q. Water control for sheet pile walls? ...

Q. Water control for sheet pile walls? Ground water flow into excavations constructed by sheet pile walls must be minimized in order to save the cost of the provision of pumpin

Lime, LIME It is significant binding material utilized in building con...

LIME It is significant binding material utilized in building construction. Lime has been utilized as the material of construction from ancient time. While it is mixed with san

Process to calculate the initial tension, Process to calculate the Initial ...

Process to calculate the Initial Tension The maximum stress induced in the prestressing tendon at the time of the stressing operation is known as initial tension in tendons. T

Terminology of earthquake, TERMINOLOGY 1. Focus: The point on the fau...

TERMINOLOGY 1. Focus: The point on the fault where slip begins is the focus. It is also called as hypocentre 2. Epicentre: The point vertically above the focus on the su

Finite Element Analysis- MATLAB problem, I am currently enrolled in a gradu...

I am currently enrolled in a graduate Civil Engineering course in Finite Element Analysis. The final assignment and project both deal with coding in MATLAB and I am having great di

Human values, give the two aspects of honesty& explain

give the two aspects of honesty& explain

Chain survey, what are the obstacles in chain survey in brief

what are the obstacles in chain survey in brief

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd