What is role of rebate in typical construction joint?

Answer
Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constructed, completed construction joints determination leave an uneven scar on concrete surface and change significantly its exterior. To avoid this, a rebate is formed throughout first pour of one side of construction common. After other pour is concreted, it will hide uneven joint inside rebate.


Related Discussions:- Role of rebate in typical construction joint

Function of reinforced concrete infill, Function of reinforced concrete inf...

Function of reinforced concrete infill in marine piling system of steel tubular pile with reinforced concrete infill Reinforced concrete is designed to fill void space inside

Optical square, Using an optical square how would you perform a rectangular...

Using an optical square how would you perform a rectangular tie?

Pcc, Specific Gravity & Water Absorption of Fine Aggregate

Specific Gravity & Water Absorption of Fine Aggregate

Bituminous macadam, What is the working capacity of a road paver per hour f...

What is the working capacity of a road paver per hour for bituminous macadam

Determine the time of settlement of a sand particle, Using Stokes' law, det...

Using Stokes' law, determine the time of settlement of a sand particle of 0.2 mm size (specific gravity 2.67) through a depth of water of 30 cm. The viscosity of water is 0.001 N-s

Shear Iosipescu Test, First Can I use this device to test concrete specimen...

First Can I use this device to test concrete specimen? Second it is very important for me that wouldn’t have tensile strength when I want to fix specimens. Because the specimens su

Transportation issues, "We have one other pressing challenge that you could...

"We have one other pressing challenge that you could review for us," Alistair Wu says. "As you know, the Shanghai plant was our first facility in China, but we also have two other

Diaphragms necessary in concrete box girder bridges, Are diaphragms necessa...

Are diaphragms necessary in designing of concrete box girder bridges ?

Explain the classification of solid waste, Explain the Classification of So...

Explain the Classification of Solid Waste  Solid waste can be classified in several different ways.  Putrescible waste - Animal and Vegetable waste From Cooking and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd