Determine the time of settlement of a sand particle, Civil Engineering

Assignment Help:

Using Stokes' law, determine the time of settlement of a sand particle of 0.2 mm size (specific gravity 2.67) through a depth of water of 30 cm. The viscosity of water is 0.001 N-sec/m2 and unit weight is 9.80 kN/m3.


Related Discussions:- Determine the time of settlement of a sand particle

Explain the term - untensioned reinforcement, Explain the term - Untensione...

Explain the term - Untensioned Reinforcement In prestressed concrete construction, use of untensioned reinforcement also has to be made alongwith tendons. This is essential as

Define mechanical tool for underwater inspection of bridge, Define Mechanic...

Define Mechanical tool for underwater inspection of bridge? Mechanical devices that involves a Schmidt Test Hammer for computing concrete surface hardness, and rotary coring eq

Explain detention or retention ponds - hydrology, Explain Detention or Rete...

Explain Detention or Retention Ponds Detention/Retention Ponds: Designed to reduce and contain the peak runoff from developed areas (more impervious). Attempt to limit the runo

Determine the allowable bearing pressure of the sand, Two load tests were c...

Two load tests were conducted at a site-one with a 0.5 m square test plate and the other with a 1.0 m square test plate. For a settlement of 25 mm, the loads were found to be 60 kN

Cumulative error, diffrence between cumilative compensative error

diffrence between cumilative compensative error

Sampling distribution and approximations of distributions, Sampling Distrib...

Sampling Distribution And Approximations Of Distributions: 1) Learnt three approaches for deriving the probability distributions of functions of one or more random variables v

Vibrocoring in marine ground investigation, Vibrocoring in marine ground in...

Vibrocoring in marine ground investigation If only shallow marine ground geotechnical information is essential for design purpose, vibrocoring is certainly a good choice for s

Stress design method, You have been selected to assist the structural engin...

You have been selected to assist the structural engineer for a bridge replacement project.  Your task is to design the size of the footing for an interior bridge pier, based on the

Raft base of pumping stations, Question Why are voids filled with light...

Question Why are voids filled with lightweight infilling material in raft base of pumping stations ? Answer To decrease dead load and therefore to decrease settleme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd