Is kerb necessary in road pavements?


Answer

In universal, kerbs are crucial in road pavements due to next cause-

(i) They supply strength to sides of road pavements and shun lateral displacement of carriageway due to traffic loads.

(ii) In provisos of road safety, they serve as a parting line between footway and carriageway and aid car drivers in driving securely.

(iii)They do something as vertical barrier to guide surface runoff collected in road pavements to gullies.


Related Discussions:- Is kerb necessary in road pavements

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Explain hydrology and evaporation, Explain Hydrology and Evaporation Hy...

Explain Hydrology and Evaporation Hydrology: Study of the circulation of water in nature.    Evaporation: Water in the liquid state transforms to vapor. Evaporation occurs f

Pros and cons of a variety of non-destructive weld methods, Question In...

Question In checking quality of weld, what are pros and cons of a variety of non-destructive weld inspection methods as in ultrasonic test, radiographic inspection and magnetic

Concrete surround for drainage pipes, Concrete surround is generally adopte...

Concrete surround is generally adopted for rigid drainage pipes to resist high traffic loads (for instance under shallow covers) and to allow for using pipes with lower strength. F

Rebound hammer.., rebound hammer working mechanism with detailed specificat...

rebound hammer working mechanism with detailed specifications of the images

Grades of concrete, mixing ratio of different type of ready mix concrete.(R...

mixing ratio of different type of ready mix concrete.(RMC)

Tests on cement, Tests on Cement: The following tests are conducted o...

Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng

#frames, confusion on shear force diagram, bending moment diagram

confusion on shear force diagram, bending moment diagram

Determine the weight of solids mixed in the suspension, In a hydrometer ana...

In a hydrometer analysis, the corrected hydrometer reading in a 1000 ml uniform soil suspension at the start of sedimentation was 28. After a lapse of 30 minutes, the corrected hyd

Physics, A point charge q2 = -2.3 µC is fixed at the origin of a co-ordinat...

A point charge q2 = -2.3 µC is fixed at the origin of a co-ordinate system as shown. Another point charge q1 = 4.0 µC is is initially located at point P, a distance d1 = 6.0 cm fro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd