What do you mean by ggbs – cement replacement, Civil Engineering

Assignment Help:

Q. What do you mean by GGBS – cement replacement?

From structural point of view GGBS replacement enhances higher durability, lower heat of hydration and higher resistance to sulphate and chloride attack when compared with normal ordinary concrete. Conversely it also contributes to environmental protection since it minimizes use of cement throughout the production of concrete. 

Though it is identified that there are still some hindrances which prevent the prevalence of its usage in local market. Theoretically speaking GGBS concrete suffers from lower rate of strength development that is highly sensitive to curing conditions. In this connection certain site measures have to be introduced to construction industry to ensure better quality of curing process in order to secure high quality of GGBS concrete. Along with designers have to be cautious of the potential bleeding problem of GGBS concrete.

Another main difficulty of extensive use of GGBS concrete lies in the little source of supply of GGBS. As Hong Kong isn't a major producer of steel and GGBS as a by-product of steel has to be imported overseas and this introduces higher material cost because of transportation and supply of GGBS is unsteady andunstable.


Related Discussions:- What do you mean by ggbs – cement replacement

Types of surveys and investigations, Types of Surveys and Investigations: ...

Types of Surveys and Investigations: For preparing a good road project, the following surveys and investigations are needed: (a)        Traffic Surveys (b)       Topogr

Define about the inclined borings, Define about the Inclined Borings In...

Define about the Inclined Borings Inclined  brings may also be used in exploration of  inclined strata and for the detection of weak pockets (lenses),  buried channels,  caviti

Construction water, what should we do if alkalinity in water is greater tha...

what should we do if alkalinity in water is greater than 25

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Properties of elastomer, An elastomer is a polymeric substance obtained aft...

An elastomer is a polymeric substance obtained after vulcanization of rubber. Vulcanization is the process of improving the properties of rubber by heating with sulphur. A normal r

Determine the head loss due to friction, Determine the Head Loss Due To Fri...

Determine the Head Loss Due To Friction Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperat

Arches, what is arches ? what are the classification of arches

what is arches ? what are the classification of arches

Define limitations of radiography - inspection of bridge, Define Limitation...

Define Limitations of Radiography - Underwater Inspection of Bridge? i. Radiography is a costly and time consuming method, which re- quires extensive safety measures to be adop

Lime, LIME It is significant binding material utilized in building con...

LIME It is significant binding material utilized in building construction. Lime has been utilized as the material of construction from ancient time. While it is mixed with san

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd