Q. What do you mean by GGBS – cement replacement?
From structural point of view GGBS replacement enhances higher durability, lower heat of hydration and higher resistance to sulphate and chloride attack when compared with normal ordinary concrete. Conversely it also contributes to environmental protection since it minimizes use of cement throughout the production of concrete.
Though it is identified that there are still some hindrances which prevent the prevalence of its usage in local market. Theoretically speaking GGBS concrete suffers from lower rate of strength development that is highly sensitive to curing conditions. In this connection certain site measures have to be introduced to construction industry to ensure better quality of curing process in order to secure high quality of GGBS concrete. Along with designers have to be cautious of the potential bleeding problem of GGBS concrete.
Another main difficulty of extensive use of GGBS concrete lies in the little source of supply of GGBS. As Hong Kong isn't a major producer of steel and GGBS as a by-product of steel has to be imported overseas and this introduces higher material cost because of transportation and supply of GGBS is unsteady andunstable.
A retaining wall 4.5 m high with vertical back supports a backfill with horizontal surface. The unit weight of the fill is 18 kN/m 3 and the angle of internal friction is 36°. The
Define the Design of Piers and Abutments Erected in Water? All piers and abutments erected in water are generally designed to be protected from scour or erosion. However, both
Can I apply for "online assignment help job" for civil engineering,physics & maths etc?
Figures (a) and (b) respectively give details of a simply-supported bridge beam and its (idealised) cross-section. In addition to the dead load of 25 kN/m (including self weight),
Dock Wall and Dry Dock: Dock Wall Figure gives the diagram of a dock wall. Figure: Mass Concrete Dock Wall Dry Dock Figure 9 gives the details
how to go about the collimation method.
Determine the stage of Cracking moment of pre-stress At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight
what is the procedure for gsb proctor test for matrial sampling for lab density
Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i) Stratigraphical survey, ii) Physical survey, and
how to design a staircase?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd