Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Resolve the force, How to find the magnitude and the direction of the resul...

How to find the magnitude and the direction of the resultant

Explain the difference in elevation between bm and tp2, Based on the inform...

Based on the information provided in Figure, the difference in elevation between BM and TP 2 is most nearly: Solution: Set up a Table as shown below and insert the kno

Explain brake and electrical horsepower, Explain Brake and Electrical Horse...

Explain Brake and Electrical Horsepower Brake horsepower (bhp) = whp/pump efficiency Electrical or motor horsepower (ehp) or (mhp) = bhp/motor efficiency Friction of heat

Landslides induced by rainfall, Landslides induced by rainfall After r...

Landslides induced by rainfall After rainfall, groundwater pressure is built up and this elevates ground water table. Water inside the pores of soil reducesthe effective stres

Deflection, solving problems with their answer

solving problems with their answer

Rcc, how many rcc is use for 1 brass?

how many rcc is use for 1 brass?

#title., desirable properties in green concrete

desirable properties in green concrete

Finite element analysis (bridge), I am a final year civil and structural st...

I am a final year civil and structural student and i need your help about my final year project. My Final Year Topic: Finite Element Analysis of a bridge using Sap2000 Aim: Fi

Elimination of formwork with reasons, Question For a l ong slender structur...

Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd