Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Alluvial streams, Alluvial Streams: In alluvial streams, the regime w...

Alluvial Streams: In alluvial streams, the regime width of a river is calculated from the Lacey's formula : W = 4.8 Q ½ where  W = Regime width in m, and Q = Discha

By which materials shank of a spur construct, Q. By which Materials Shank o...

Q. By which Materials Shank of a spur construct? Shank of a spur is constructed of sand core and its exposed faces are protected by stone pitching. The attack at nose is very h

State the natural frequency of a machine foundation, State the natural freq...

State the natural frequency of a machine foundation of base area 2m × 2m and weight 150 kN, suppose that the soil mass participating in the vibration is 20% of the weight of founda

State average increase of pressure in the clay stratum, A building was to b...

A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu

Main concern regarding design of pavements, Question If In case a road ...

Question If In case a road passes from side to side a reclaimed land and an existing land, what is key main concern regarding design of pavements? Answer For a breathin

Role of rebate in typical construction joint, Question What is role of reba...

Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr

How to design banks, Q. How to design banks? When approach banks are of...

Q. How to design banks? When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious o

Backward and forward curved vanes in pumps, Backward curved vanes vs. forwa...

Backward curved vanes vs. forward curved vanes in pumps  Power of a pump is related to discharge as follows: Power = k 1 Q + (k 2 Q 2 / tan A) Where K 1 and K 2 are

What is the liquidity index, A soil has a plastic limit of 25% and a plasti...

A soil has a plastic limit of 25% and a plasticity index of 30. If the natural water content of the soil is 34%, what is the liquidity index and what is the consistency index? H

Determine the water-cement ratio, A concrete batch plant provided the Desig...

A concrete batch plant provided the Design Strength for the engineer's mix design to match the project's specification requirement for a 4000 psi Tremie pump mix.  The Water-cement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd