Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Verify the magnification and transmitted force, The exciting force in a con...

The exciting force in a constant force type of excitation was 120 kN. The natural frequency of the machine foundation is 4 Hz. The damping factor is 0.36. Verify the magnificati

Can all utility detectors detect depth of utilities, Question Can all u...

Question Can all utility detectors detect depth of utilities ? Answer In Hong Kong, underground utility detectors are as a rule separated into two categories- electro

State the process to calculate the transmission length, State the process t...

State the process to calculate the Transmission Length It is the distance required at the end of a concrete member for developing the maximum tendon stress by bond.

Importance of poles in critical load combinations, Importance of poles in c...

Importance of poles in critical load combinations The poles are generally designed for the following critical load combinations  : (a)  Bending due to wind load on the cable

Determine the thermal stress in the bar, Determine the thermal stress in th...

Determine the thermal stress in the bar: A stepped bar made of aluminum is held between two supports. The bar is 900 mm in length at 38ºC, 600 mm of which is having a diameter

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Surveying, tracing paper method for solving three point problem?

tracing paper method for solving three point problem?

Tools of measerments, where i can get the tools of different types of mease...

where i can get the tools of different types of measerments of differents elements of construction?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd