Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Protection of line in case of stop dead restriction, Q. Protection of line ...

Q. Protection of line in case of ‘STOP DEAD RESTRICTION' for carrying out a work of short duration on a single line section on a B.G. route  Ans. Protection in block sectio

Upper bound of indirect tensile strength, Question While designing rese...

Question While designing reservoirs, indirect tensile strength of the concrete mix is particular to be less than a specific value such as 2.8N/mm2 for potable water. Why ought

Factor that affect the bearing capacity of a shallow footing, State the var...

State the various factors that affect the bearing capacity of a shallow footing. Write short note critical notes on settlement of foundations. How do you ascertain whether a fou

Explain the ion exchange water softening, Explain the Ion Exchange water So...

Explain the Ion Exchange water Softening Softening is usually done using a resin (natural or synthetic long chain chemical with a sodium ion attached). When water containing ha

For the plane area shown determine the first moments, for the plane area sh...

for the plane area shown determine the first moments with respects to the x & y axis & the location of the centroid

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

Turbines, How do we get electricity even when the gates of a dam were close...

How do we get electricity even when the gates of a dam were closed?

Explain the critical depth, Explain the Critical Depth d c is the dept...

Explain the Critical Depth d c is the depth of flow in an open channel that has the lowest energy.  In rectangular open channels:  (d c ) 3 = Q 2 /g(w) 2 In nonrectang

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd