Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Amount of borrow needed to bring area to elevation of 90-ft, Surveyed eleva...

Surveyed elevations are shown in Figure for a 50' x 50' grid at a proposed parking lot location. The amount of borrow needed to bring the area to an elevation of 90-ft is most near

#frames, confusion on shear force diagram, bending moment diagram

confusion on shear force diagram, bending moment diagram

Transportation issues, "We have one other pressing challenge that you could...

"We have one other pressing challenge that you could review for us," Alistair Wu says. "As you know, the Shanghai plant was our first facility in China, but we also have two other

Material engineering assignment, select three materials metal and non meala...

select three materials metal and non mealat at least one of the selected materials shold change its property

Zeroth law of thermodynamics, Two systems which are equal in temperature to...

Two systems which are equal in temperature to a third system are equal in temperature to each other

What is the station at point b, What is the station at Point B? SO...

What is the station at Point B? SOLUTION 3 Station at Point A = Sta 22+45  Station at Point B = (Sta 22+45) + 1028' = 2245'+1028' =3273'  = Sta 32+73

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd