Complete embedment of pipelines into thrust blocks, Civil Engineering

Assignment Help:

Q. Complete embedment of pipelines into thrust blocks

For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surface between pipelines and concrete thrust blocks must not exceed 45o from either side of pipe in the direction of thrust force through the centre of pipelines. The reason is to prevent occurrence of potential cracking arising from deformation of pipelines under loading condition. If it is essential to embed the whole section of pipelines into concrete, it's suggested to coat the pipe with a flexible material.


Related Discussions:- Complete embedment of pipelines into thrust blocks

Raft and beam foundation, why is weight of raft not considered in structura...

why is weight of raft not considered in structural design of raft and beam

Calculates the energy required, Write a program called, A1Q1, that reads a ...

Write a program called, A1Q1, that reads a single letter.   It will then display the corresponding ASCII code of the letter and prints the next character and the character which is

Calculate the degree of saturation of the soil, A clay sample, having its n...

A clay sample, having its natural moisture content, weighs 0.333 N. The specific gravity of solids of this soil is 2.70. After oven-drying, the soil sample weighs 0.2025 N. The vol

What should be the hydrometer reading, A litre of suspension containing 0.5...

A litre of suspension containing 0.5 N of soil with a specific gravity of 2.70 is prepared for a hydrometer test. When no temperature correction is considered necessary, what shoul

Prismatic compass, Figure, working,principle of prismatic compass

Figure, working,principle of prismatic compass

Calculate the fuel consumed, A 160-HP Diesel engine (peak fuel consumption ...

A 160-HP Diesel engine (peak fuel consumption = 0.04-gal/HP-hr) hydraulic excavator operates on a cycle time of 20 seconds during a 50-min/hr.  During the filling of the bucket cyc

Bituminous macadam, Bituminous Macadam: Bituminous Macadam (BM) is a ...

Bituminous Macadam: Bituminous Macadam (BM) is a base course in which coarse aggregates are mixed with a bituminous binder. The mix is open-graded with 20-25 per cent voids.

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd