Illustrate concept of filter design, Civil Engineering

Assignment Help:

Q. Illustrate Concept of filter design?

The material used for filter should satisfy the following normal criteria

a. Filter material is more pervious than the base material / core material

b. Filter material has such gradation that the particles of base / core material do not migrate through. Such migration can clog the voids and fail the very purpose of a filter.

c. Filter material helps to form natural graded material in the zone of base material / core material.

d. Normally, natural material to satisfy the above requirements is not readily available in nature. A graded filter design consists of layers of different grades.

e. To minimise segregation, each grade of the filter material is normally very uniform in size.


Related Discussions:- Illustrate concept of filter design

Bending moments& shear force, calculate bending &shear force of 16kn/m and ...

calculate bending &shear force of 16kn/m and draw the shear force and bending moment diagrams

#title Design a gravity-flow sanitary sewer , i have to Design a gravity-f...

i have to Design a gravity-flow sanitary sewer to serve and i need it to be done asap

What do you understand by percolation of water, Q. What do you understand b...

Q. What do you understand by Percolation of water? Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body.

Explain types of tiles, Q. Explain Types Of Tiles? Different types of t...

Q. Explain Types Of Tiles? Different types of tiles available in the market for floor and walls & dado are as under - 1. Glazed tiles , 2. Ceramic tiles , 3. Granit

Necessity of air voids in bituminous pavement, Q. Necessity of air voids in...

Q. Necessity of air voids in bituminous pavement? If the presence of air voids is too high, it results in an increase of permeability of bituminous pavement. This enables the f

Curing, curing of brick masonry

curing of brick masonry

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd