Mosaic and p v c tiles, Civil Engineering

Assignment Help:

Q. Mosaic and P V C Tiles?

The water sink at water points may be provided with mosaic lining at other than important station. Mosaic tiles also may be provided in flooring of Type IV & V railway quarters .

Use of P V C Tiles should be restricted in public places like waiting room etc or they lend scratch marks with movement of furniture luggage etc. It may be used only in dados where scratches are not likely to occur.


Related Discussions:- Mosaic and p v c tiles

Construction of concrete carriageway, Question If construction of conc...

Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway

Water sources and requirements, Water Sources and Requirements: In thi...

Water Sources and Requirements: In this part, we have discussed: (a) Basic concepts in planning of water supply schemes. (b) Various types of water requirement. (c) S

Use Structural Analysis in Engineering, As per Australian Standard AS 1170,...

As per Australian Standard AS 1170, what are the different types of loads that can be encountered by structures which need to be taken into account for their design?

Water hammer, how can Simulink calculate wave speed of water hammer

how can Simulink calculate wave speed of water hammer

Define cyclic force transfer test of shock transmission unit, Define Cyclic...

Define Cyclic Force Transfer Test of Shock Transmission Unit? This test is specified to prove that the STU would function as intended during a seismic event. The STU shall be t

Mini projcts in diaster management.., any new innovative metods to protct b...

any new innovative metods to protct building from disater

Packing resources in joint of concrete pipes in pipe jacking, Question ...

Question What is key function of packing resources in joint of concrete pipes in pipe jacking ? Answer Packing resources are about 10 to 20mm broad and are usually mad

Raft foundation, after formation of the soil under raft some area around th...

after formation of the soil under raft some area around the lift pit for example will be on tipping shape and some column placed in the same area the question how we place the col

Contractor to continue concreting works, Question If on-site slump test fai...

Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd