Q. Necessity of pile tip cover for rock-socketed H-piles?

In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The objective of such arrangement is to avoid the potential occurrence of corrosion to H-piles just in case concrete cover isn't designed at pile tips. Though recent field andlaboratory observations had reservation of this viewpoint. In case H-piles are designed to be placed directly on top of rock surface, it provides tip resistance to limit the pile movement in the event of bond rupture between H-piles and grout. Some contractors can choose to tamp the H-piles by employing drop hammers to make sure the H-piles are founded directly on top of rock surface. Practically speaking, it poses difficulties at the time of process of tamping since there is a chance of possible buckling of long H-piles when too much energy is provided to piles.


Related Discussions:- Necessity of pile tip cover for rock-socketed H-piles

Can u give me a sample assignment, im newer to the courses so i would like ...

im newer to the courses so i would like to know about the assignment types. in this case can u please show me a sample assignment?

Define the approach velocity, Define the Approach Velocity Typical prob...

Define the Approach Velocity Typical problems have negligible approach velocity.  v 1 = Q/A, where A = the cross-sectional area of flow in the channel. The value is not the ve

Pavement design, differences between highway pavement and airfield pavement...

differences between highway pavement and airfield pavement

Arches and lintels, classification of arches based on their shape are?

classification of arches based on their shape are?

Coagulation, Incoming water contains 2.5 mg/L as a substance of natural alk...

Incoming water contains 2.5 mg/L as a substance of natural alkalinity (HCO3-). The flow rate is 9.5 ML/day). (a) What feed rate is required if the alum dose is 7 mg/L and is avail

Concrete technology, why strength of transition zone is less than bulk past...

why strength of transition zone is less than bulk paste

Settlement due to reduction in volume of soil, Q. Settlement due to Reducti...

Q. Settlement due to Reduction in Volume of Soil? The weight of the structure causes reduction in volume of soil due to expulsion of pore water from the voids. This reduces the

Determine the characteristic load for structure, Determine the Characterist...

Determine the Characteristic Load for structure The Load, which has 95 percent probability of not being exceeded during the life of a structure, is considered as characteristic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd