Q. Function of prime coat in bituminous pavement?
The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the presence of moisture affects the strength of subgrade, prevention of water entry at the time of construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, danger of frost heave can be minimized.
Prime coat is an asphalt that, when applied evenly to the surface of subgrade orsub-base, serves to seal the surface to hinder the penetration of moisture into subgrade. Vehicular traffic must be avoided on the surface sprayed with prime coat since the traction and tearing action of vehicles would damage this asphalt layer.
Fig: Position of application of prime coat
Use of Admixtures in Concrete The use of chemical admixtures may be made in prestressed concrete construction. But the admixture should not contain chlorides in any form. This
a. We put a lot of time and effort into cultivating our activated sludge microbial community. So why do we waste sludge out of it? b. A wastewater discharges to Puget sound, a mari
Design approach for the spacing of min-piles For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of
EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE AID OF A DIGRAM
Concrete Mix Proportions Concrete mix proportions should be chosen in such a way that concrete of adequate workability is obtained. Workability of concrete mix should be such t
individual wall methods benefits?
Verify the grain specific gravity In a specific gravity test, the weight of the dry soil taken is 0.66 N. The weight of the pyknometer filled with this soil and water is 6.756
sieve analsis full asignment
what are The regulations and specification that followed for compaction works for earth dam in Oman.
Explain with lime soda process?cold lime soda process&hot lime soda process and it''s equations?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd