Q. Function of prime coat in bituminous pavement?
The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the presence of moisture affects the strength of subgrade, prevention of water entry at the time of construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, danger of frost heave can be minimized.
Prime coat is an asphalt that, when applied evenly to the surface of subgrade orsub-base, serves to seal the surface to hinder the penetration of moisture into subgrade. Vehicular traffic must be avoided on the surface sprayed with prime coat since the traction and tearing action of vehicles would damage this asphalt layer.
Fig: Position of application of prime coat
Enlongations in solids based on elastic constants
Q. What is Venturimeter? The Venturimeter is an apparatus for finding out the discharge of a liquid flowing in a pipe . A Venturimeter in its simplest from consist of the follo
Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons
Define Electrical tool for underwater inspection of bridge? Electrical equipment like Rebar Scanner for scanning of rebars; underwater sonic and ultrasonic equipment for observ
Q. What is the importance of General and subsidiary rules. What is the main differences between the two. Ans.- Importance of General and subsidiary rules - General and su
Functions of different reinforcement in a typical pile cap Loads from columns transferring to pile cap persuade tensile forces at the bottom of cap. For example, by using trus
Features of a Stratigraphical Survey phase The principal features of a Stratigraphical Survey phase are: a) Determination of depth of ground water, thickness, extent and ap
A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti
how to rectify tilt of well
rebound hammer working mechanism with detailed specifications of the images
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd