Function of prime coat in bituminous pavement, Civil Engineering

Assignment Help:

Q. Function of prime coat in bituminous pavement?

The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the presence of moisture affects the strength of subgrade, prevention of water entry at the time of construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, danger of frost heave can be minimized.

Prime coat is an asphalt that, when applied evenly to the surface of subgrade orsub-base, serves to seal the surface to hinder the penetration of moisture into subgrade. Vehicular traffic must be avoided on the surface sprayed with prime coat since the traction and tearing action of vehicles would damage this asphalt layer.

477_Function of prime coat in bituminous pavement.png

Fig: Position of application of prime coat


Related Discussions:- Function of prime coat in bituminous pavement

Strength of rivet joints, Ask question #Minimum 100 Please help me to...

Ask question #Minimum 100 Please help me to write a c program to determine strength and efficiency of single cover butt joint, lap joint, double cover butt joint . words ac

leveling, what are the diff.types of levels used in levlin

what are the diff.types of levels used in levling

Scheme of some smaller piles with same load capacity, Question Which wi...

Question Which will be a better choice, a large diameter piles or a scheme of some smaller piles with same load capacity ? Answer Choice of a large diameter pile suff

Explain inspection tools for underwater inspection of bridge, Explain the I...

Explain the Inspection Tools for Underwater Inspection of Bridge? So many Inspection tools are available. The dive team should have access to the suitable tools and equipments

Function of longitudinal joints in concrete road pavements, Question Wh...

Question What is function of longitudinal joints in concrete road pavements ? Answer A longitudinal joint consists of a tie bar located at mid-depth of a concrete pav

Compatibility condition, Compatibility Condition: Total strain in ste...

Compatibility Condition: Total strain in steel = Total strain in copper i.e. 3 × 10 -4 + 1.965 × 10 -5 P s   = 4.5 × 10 -4 + 1.8421 × 10 -5 P c Recognising that P

Traverse, how to fill traverse computation sheet of opened traversig ..

how to fill traverse computation sheet of opened traversig ..

Explain the installation of shock transmission unit, Explain the Installati...

Explain the Installation of Shock Transmission Unit? It is not always necessary to install STUs while a structure is under construction but the holding down anchor bolts and th

Railway bridge, how to measure the waterways of railway bridges

how to measure the waterways of railway bridges

Varignon''s Theorem, What is the easiest way to give proof the varignon''s ...

What is the easiest way to give proof the varignon''s theorem? Help please guys

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd