Q. Function of prime coat in bituminous pavement?
The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the presence of moisture affects the strength of subgrade, prevention of water entry at the time of construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, danger of frost heave can be minimized.
Prime coat is an asphalt that, when applied evenly to the surface of subgrade orsub-base, serves to seal the surface to hinder the penetration of moisture into subgrade. Vehicular traffic must be avoided on the surface sprayed with prime coat since the traction and tearing action of vehicles would damage this asphalt layer.
Fig: Position of application of prime coat
Describe why soils are compacted in the field. How is the degree of compaction ensured in the field (i.e., control of field compaction)? Distinguish among 'compaction' and 'consoli
A soft, normally consolidated clay layer is 18 m thick. The natural water content is 45%. The saturated unit weight is 18 kN/m 3 ; the grain specific gravity is 2.70 and the liqui
A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of
Breakwater and its types
State the term - transverse force on concrete We know that in pre-stressed concrete, tendons are placed in a stretched condition and they always would try to regain their origi
Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit
Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p
They stop, or slow down erosion, and stop long shore drift. This, though, can have bad knock-on effects somewhere near.
processes of chemical prestressing
CASTE DISCRIMANIMATION
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd