Q. Function of prime coat in bituminous pavement?
The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the presence of moisture affects the strength of subgrade, prevention of water entry at the time of construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, danger of frost heave can be minimized.
Prime coat is an asphalt that, when applied evenly to the surface of subgrade orsub-base, serves to seal the surface to hinder the penetration of moisture into subgrade. Vehicular traffic must be avoided on the surface sprayed with prime coat since the traction and tearing action of vehicles would damage this asphalt layer.
Fig: Position of application of prime coat
how does the particle number and size affect the slurry flow in a centrifugal pump?!
the importance of softening point of a bitumen material in the design of a pavement
Define Limitations of Underwater Magnetic Particle Testing? As with any non-destructive test method, UWMT has some limitations as under: i. Underwater magnetic particle tes
CASTE DISCRIMANIMATION
Define the Hazardous Waste 1. Any waste or combination of waste that poses a substantial danger now or future to humans, plants, and animals without special precautions. 2.
Question What is key disparity between working stress approach and limit state approach ? Answer Working stress approach, service loads are used in whole plan and st
what is the trignomerty leveling
Define Corrosion - Deterioration of Steel Structures? Corrosion is the principle cause of deterioration of steel structures. Corrosion of steel is an electrochemical process th
radial line method practical
Q. As an AEN in charge, what inspection will you under taken at the time of inspection of Girder Bridge 3 x 60 feet. Please explain the important items to be o
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd