Define unit hydrograph - hydrology, Civil Engineering

Assignment Help:

Define Unit Hydrograph

UNIT HYDROGRAPH: The hydrograph developed for a drainage basin (watershed) from the runoff of a 1 in or 1 cm storm. It is the base hydrograph from which other hydrographs can be drawn by ratio for < or > 1in or 1 cm of precipitation/runoff.

 


Related Discussions:- Define unit hydrograph - hydrology

Scaffolding, definition for double type scaffolding

definition for double type scaffolding

Surveying, how to defined work from whole to the part

how to defined work from whole to the part

What do you understand by percolation of water, Q. What do you understand b...

Q. What do you understand by Percolation of water? Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body.

Slope protection, what is the type of slope protection that use rocks and p...

what is the type of slope protection that use rocks and put cements between those rocks??the concept is same as brick layer

Purpose of the gap in the road on this bridge, What is the purpose of the g...

What is the purpose of the gap in the road on this bridge? Ans) Purpose of the gap in the road is to permit the road to expand and contract with temperature alters without causi

Cement, Ask What is the density of cement?

Ask What is the density of cement?

Determine the allowable pressue, The data profile as shown in Figure is obt...

The data profile as shown in Figure is obtained. A best average of N values gave N 10 = 21, column loads including dead and live loads ranged from 500 kN to 950 kN. Determine the

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Kicker of reinforced concrete cantilever retaining walls, Q. Kicker of rein...

Q. Kicker of reinforced concrete cantilever retaining walls located at the position of largest moment and shear force - why? Generally for reinforced concrete cantilever retai

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd