Calculate the cost to finance the construction project, Civil Engineering

Assignment Help:

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of 14-months. The Contractor secured a bank loan with an interest rate of 1% per month on the outstanding balance. The Contractor will borrow $100,000 per month to reconcile costs at the end of months 1 through 12. Calculate the cost to finance the project that will be included as part of the bid.

Solution: At the end of month 12, the contractor will have borrowed 12 payments of $100,000 each.  The owner is scheduled to pay the contractor at the end of month 14 at which time the contractor will repay the bank.  Use the following equation to calculate the future value then extract the cost of financing the project:  

F = $100,000 (F/A, 1%, 12) (F/P, 1%, 2)   = $1,293,700

                                         Amount Borrowed =$1,200,000

                                    Amount of interest =$     93,700


Related Discussions:- Calculate the cost to finance the construction project

Surveying, what is meant by geodetic survey

what is meant by geodetic survey

Axial flow pumps for large flows and low heads, Q. Axial flow pumps for lar...

Q. Axial flow pumps for large flows and low heads? It is well known that axial flow pumps are the most suitable for providing large flows and low heads. Reason behind this is c

Optimum moisture content to grab maximum density, Question For compacti...

Question For compaction of free-draining sands or gravels, what is optimum moisture content to grab maximum density ? Answer Compaction curve of dirty materials is com

Review of available records - underwater inspection, Review of available Re...

Review of available Records - Preparation for Underwater Inspection? Before taking up the underwater inspection, a detailed review of drawings and past report should be carried

Show the replacement of loose rivets, Q. Replacement of loose rivets? i...

Q. Replacement of loose rivets? i) Slight slackness of rivet does not cause loss of rivet strength. ii) Renewal of slack rivets should be done only when the slack rivets are

House, how to make a home

how to make a home

Usage of double air valves and single air valves, Question In designig ...

Question In designig of watermains, how to decide usage of double air valves and single air valves ? Answer Single air control device let squeezing air out of p

Sea breeze and land breeze, Explain the following: (a) Sea breeze and L...

Explain the following: (a) Sea breeze and Land breeze (b) What is Thermal comfort (c) What is Global wind pattern and Coriolis effect (d) How wind affects the tempe

Structural drawing, Overview   A structure is required to support a conv...

Overview   A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd