Explain the Underwater Problems and Material Defects?
The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding agent, have been used extensively for building bridges. Cast iron piles have been used as substructure in many bridges. These materials are prone to different types of failure and, therefore, require different inspection strategies. The major problem in steel bridges is corrosion. Concrete bridges are susceptible to spalling and scour.
Bridges built in masonry have the problem of deterioration of brick / stone elements accompanied with loss of mortar. Aquatic environment has significant effects on bridges in addition to those mentioned above. Heavy current is especially destructive. Floods cause damage from rapidly moving water as well as from the impact of large moving debris. The bridge substructure can also get damaged due to accidental man inflicted causes and earthquakes.
Details of a simply-supported beam are given in Figures (a) and (b). Note that the dead load, g includes the self weight. Design the transverse shear reinforcement in ter
need help for assignment that requires strand 7 and autocad
Determine the normal and shear stress elements: The state of stress at a point is given through the stress components σ x = 70 MPa, σ y = 10 MPa, and τ xy = - 40 MPa. Using
Q. Design of elastomeric bearings? The standard drawings of bridge bearings issued by RDSO are on the basis of UIC 772-R. To maintain uniformity of approach, the design of elas
find the pressure head at 2-2 if the rate of flow in pipe is 0.36m^3/s
1. [6 marks] Treating the bar illustrated above as being a one dimensional axial bar where plane sections remain plane and parallel, analyse the bar using the Galerkin finite eleme
Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/
Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers. 2
i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the tra
What is the meaning of term -Slip in Anchorage In the case of post-tensioned concrete, when the tendons are anchored at the ends of concrete members, a slip of tendons takes
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd