Concrete surround for drainage pipes, Civil Engineering

Assignment Help:

Concrete surround is generally adopted for rigid drainage pipes to resist high traffic loads (for instance under shallow covers) and to allow for using pipes with lower strength. Furthermore the use of concrete surround can minimize settlement of adjacent structures. Additionally the highest possible accuracy in levels and gradient can be achieved by using concrete surround as considerable settlement is expected in other categories of beddings such as granular bedding. 

The distribution of reinforcement in concrete pipes can't be uniform due to the occurrence of tensile stresses in different locations around the circumference of pipes. For illustration tensile stresses are highest at the inner face of pipes at invert and crown levels and at outer face of two sides of pipes. An elliptical cage can be designed in order to optimize the usage of steel reinforcement.

381_Concrete surround for drainage pipes.png

Fig: Concrete surround of drains


Related Discussions:- Concrete surround for drainage pipes

Premix carpet - road pavements, Premix Carpet: An open graded premix ...

Premix Carpet: An open graded premix carpet, commonly called premix carpet (PC), is an open graded premixed material laid to a thickness of 20 mm and rolled, followed by a se

Define collisions - underwater inspection of bridge, Define Collisions - Un...

Define Collisions - Underwater Inspection of Bridge? Structural damage to underwater portions of a bridge can either be collision related or direct result of a collision. Colli

Explain the operating point - pumping system, Explain the Operating Point -...

Explain the Operating Point - Pumping System Intersection of the characteristic curve and the system curve. This is the head and flow rate data for the pump "operation". The op

Road pavements, Road Pavements: Pavements constitute an important part...

Road Pavements: Pavements constitute an important part of road as they withstand the traffic loads and transmit them to the earthen embankment. A study of the types of pavemen

Plants aeration period, Plants aeration period: Problem: What i...

Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated

Ghgh, Ask quhestion #Minimum 100 words accepted#

Ask quhestion #Minimum 100 words accepted#

Road base and base course in flexible carriageway, Road base vs. base cours...

Road base vs. base course in flexible carriageway Roadbase is the most significant structural layer in bituminous pavement. It's designed to take up the function of distributi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd