Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well be compiled in a master list.  For each bridge requiring underwater inspection, the following information should be collected as a minimum and considered while planning its inspection.

-   Type and location of the bridge

-   Type and frequency of the required inspection

-   Location of members to be inspected

-   Inspection procedures to be used

-   Special equipments requirement

-   Dates of previous inspections

-   Findings of the last inspection

-   Follow up action taken on findings of the last inspection

-   Type of foundation

-   Bottom of foundation elevation or pile/well tip elevation


Related Discussions:- Explain the selected bridges - underwater inspection

Stress, stress and there types

stress and there types

What is load carrying capacity of a pile, Q-  What are loads and forces ta...

Q-  What are loads and forces taken into account for designing a pile and what is load carrying capacity of a pile. Ans. For designing a pile the following loads and force ar

Test for determination of shear modulus, Test for determination of Shear Mo...

Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un

Explain the corrosion by the action of bacteria, Explain the Corrosion by t...

Explain the Corrosion by the Action of Bacteria? Corrosion can also be accelerated by the action of bacteria.  In the absence of oxygen, sulphate-reducing bacteria can grow, an

Cross Section Method, Cut and Fill Calculation Using Cross Section Method

Cut and Fill Calculation Using Cross Section Method

Foundation, The strap serves the same purpose as the interior portion of a ...

The strap serves the same purpose as the interior portion of a combined footing but is much narrower to save materials. ? The resultant soil pressure is assumed at the centers of b

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd