Explain the Selected Bridges - Underwater Inspection?

Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well be compiled in a master list.  For each bridge requiring underwater inspection, the following information should be collected as a minimum and considered while planning its inspection.

-   Type and location of the bridge

-   Type and frequency of the required inspection

-   Location of members to be inspected

-   Inspection procedures to be used

-   Special equipments requirement

-   Dates of previous inspections

-   Findings of the last inspection

-   Follow up action taken on findings of the last inspection

-   Type of foundation

-   Bottom of foundation elevation or pile/well tip elevation


Related Discussions:- Explain the selected bridges - underwater inspection

Concrete compaction in piling works, Question What is the reason that v...

Question What is the reason that vibrators not used in concrete compaction in piling works ? Answer Concrete for piles must be a high-slump self-compacting mix that i

What is standard penetration test, a) Describe the recommended construction...

a) Describe the recommended construction practices to avoid deterimental differential settlement in large structures. (b) What is meant by bearing capacity of soil? How will ver

Zero energy building, This is our final year project can u suggest some tip...

This is our final year project can u suggest some tips to do well...

Determine the active thrust on the wall, A retaining wall 9 m high retains ...

A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall

Open foundation, what is savest foundation in the soft sanded earth

what is savest foundation in the soft sanded earth

Work study, how activity charts and string diagram use in work study?

how activity charts and string diagram use in work study?

Reasons of ground heaving during pipe-jacking, Reasons of ground heaving du...

Reasons of ground heaving during pipe-jacking It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer mus

Wet mix, how to design wet mix

how to design wet mix

Concrete mix design for Volumetric site mix, Please advise what is the prop...

Please advise what is the proportion of mix to achieve 45N/sq. mm compressive strength with 370Kg.SR cement per cubic meter and 35N/Sq.mm strength with OPC cement 330 kg per cubic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd