Explain the selected bridges - underwater inspection, Civil Engineering

Assignment Help:

Explain the Selected Bridges - Underwater Inspection?

Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well be compiled in a master list.  For each bridge requiring underwater inspection, the following information should be collected as a minimum and considered while planning its inspection.

-   Type and location of the bridge

-   Type and frequency of the required inspection

-   Location of members to be inspected

-   Inspection procedures to be used

-   Special equipments requirement

-   Dates of previous inspections

-   Findings of the last inspection

-   Follow up action taken on findings of the last inspection

-   Type of foundation

-   Bottom of foundation elevation or pile/well tip elevation


Related Discussions:- Explain the selected bridges - underwater inspection

Rebound hammer.., rebound hammer working mechanism with detailed specificat...

rebound hammer working mechanism with detailed specifications of the images

Water waste engineering, wahat is physical characteristic on total suspende...

wahat is physical characteristic on total suspended solid

Concrete mix design for Volumetric site mix, Please advise what is the prop...

Please advise what is the proportion of mix to achieve 45N/sq. mm compressive strength with 370Kg.SR cement per cubic meter and 35N/Sq.mm strength with OPC cement 330 kg per cubic

Explain damage inspections - underwater inspection of bridge, Explain the D...

Explain the Damage inspections - underwater inspection of bridge? Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aime

What is pratt truss, Q. What is Pratt truss? Pratt truss is characteriz...

Q. What is Pratt truss? Pratt truss is characterized by having its diagonal members (except the end diagonals) slanted down towards the middle of bridge span. Under such struct

Application of levelling, how do I draw sections(longitudinal and cross sec...

how do I draw sections(longitudinal and cross sections)?

Two pegs test, the distance between two pegs M and N is 7,063 as measured o...

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

Mechanism of plastic settlement in fresh concrete, Q. Mechanism of plastic ...

Q. Mechanism of plastic settlement in fresh concrete? Within a few hours after placing of fresh concrete, plastic concrete can experience cracking due to occurrence of plastic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd