Explain the selected bridges - underwater inspection, Civil Engineering

Assignment Help:

Explain the Selected Bridges - Underwater Inspection?

Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well be compiled in a master list.  For each bridge requiring underwater inspection, the following information should be collected as a minimum and considered while planning its inspection.

-   Type and location of the bridge

-   Type and frequency of the required inspection

-   Location of members to be inspected

-   Inspection procedures to be used

-   Special equipments requirement

-   Dates of previous inspections

-   Findings of the last inspection

-   Follow up action taken on findings of the last inspection

-   Type of foundation

-   Bottom of foundation elevation or pile/well tip elevation


Related Discussions:- Explain the selected bridges - underwater inspection

Explain the term- shrinkage of concrete, LOSS OF PRESTRESS DUE TO SHRINKAG...

LOSS OF PRESTRESS DUE TO SHRINKAGE OF CONCRETE We know that concrete shrinks in volume when it dries up. This volume reduction takes place in the form of reduction of all dime

Human resource, Ask question #Minimum 100 words acceFor this discussion, lo...

Ask question #Minimum 100 words acceFor this discussion, look at a specific country of your choice. Develop two brief introductions, one for a U.S. peer, and one for a peer in anot

State the short-term deflections, State the short-term deflections If  ...

State the short-term deflections If  short-term deflections are considered, the instantaneous deflection due to design loads may be calculated using elastic analysis based on t

Flat footed rail, pls tell about flat footed rail and it weight how much fo...

pls tell about flat footed rail and it weight how much for 40 * 80 *10 mm

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Shear lag in typical box-girder bridge, Shear lag in typical box-girder bri...

Shear lag in typical box-girder bridge For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flang

Trigonometry, #question a pilot entering a bay on course 60.3 degrees at sp...

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

Sewer manhole, minimun difference in level of inlet and oulet pipe level in...

minimun difference in level of inlet and oulet pipe level invert in manhole

What is contact pressure, What is 'contact pressure'? How does it depend on...

What is 'contact pressure'? How does it depend on the type of structure and type of soil? What is 'active zone' in soil? Define it with reference to the pressure bulb concept.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd