Explain the selected bridges - underwater inspection, Civil Engineering

Assignment Help:

Explain the Selected Bridges - Underwater Inspection?

Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well be compiled in a master list.  For each bridge requiring underwater inspection, the following information should be collected as a minimum and considered while planning its inspection.

-   Type and location of the bridge

-   Type and frequency of the required inspection

-   Location of members to be inspected

-   Inspection procedures to be used

-   Special equipments requirement

-   Dates of previous inspections

-   Findings of the last inspection

-   Follow up action taken on findings of the last inspection

-   Type of foundation

-   Bottom of foundation elevation or pile/well tip elevation


Related Discussions:- Explain the selected bridges - underwater inspection

BESHOOOOO, what are the dimensions of a sheet of paper required for plottin...

what are the dimensions of a sheet of paper required for plotting a traverse ABCDE with 1 : 250 scale if a margin of 4 cm to the right and left sides and a6 cm margin to the other

Compare the values of active and passive earth pressures, A retaining wall ...

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo

Terminology of earthquake, TERMINOLOGY 1. Focus: The point on the fau...

TERMINOLOGY 1. Focus: The point on the fault where slip begins is the focus. It is also called as hypocentre 2. Epicentre: The point vertically above the focus on the su

Mixture of phases, Phases are usually identifiable because of adifference i...

Phases are usually identifiable because of adifference in density which causes gravitational separation. e.g. Ice floats on water, steam rises.

Docks, DOCKS: Types of Docks Docks are artificial enclosures ...

DOCKS: Types of Docks Docks are artificial enclosures for the reception of ships. Three types of docks are found : (a)        Harbour Docks, or Wet Docks, which ar

Plane table surveing, in plane table surveying which activity is done first...

in plane table surveying which activity is done first whether centering or levelling?

Explain the well drawdown equations - ground water, Explain the Well Drawdo...

Explain the Well Drawdown Equations Watch the units, especially if you use log 10 or ln.    h 1 = aquifer thickness minus the drawdown (ft)  r 1 = distance from well (ft

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd