What was the distance between the markers

Assignment Help Civil Engineering
Reference no: EM13564958

1.A 100 ft cut steel tape was used to measure between two property markers. The rear surveyor held 93 ft, while the head surveyor cut .67ft. What was the distance between the markers?

2.What is the length of a 200 ft. steel tape having a cross-sectional area of 0.004in2 and a modulus of elasticity of 30,000,000 lb/in2 that is standardized at a tension of 20 lb and a temperature of 68°F if it is pulled at a tension of 33 lb at 95°F? The tape weight is 0.02 lb/ft and is only supported at the ends.

Reference no: EM13564958

Questions Cloud

What is the concentration of residual nh3 in the aqueous was : Waste dairy whey is used to grow Kluyveromyces fragilis yeast in a continuous culture system operated at 30C and 1 atm pressure. Medium containing 4% w/w lactose (C12H22O11) and 0.15% w/w NH3 flows into a specially designed aerated bioreactor at a ra..
Determine the upstream depth of flow in a subcritical : Determine the upstream depth of flow in a subcritical transition from an upstream rectangular flume that is 49ft wide to a downstream trapezoidal channel with a width of 75ft and side slopes
How much would the volume of 1m^3 of water at 20c : Water is weakly compressible but often assumed incompressible; check the validity of this assumption. Using Table 3.1.2 in the text, how much would the volume of 1m^3 of water at 20C change if subjected to the pressure exerted by a 70m column of wate..
What angle would be needed in order for an equivalent body : The face of a 100m wide rectangular dam is built at an angle of 60 degrees above the horizontal and holds back a body of fresh water that is 30m deep at the face of the dam
What was the distance between the markers : A 100 ft cut steel tape was used to measure between two property markers. The rear surveyor held 93 ft, while the head surveyor cut .67ft. What was the distance between the markers?
Calculate the flow in the river just downstream : An industrial wastewater is discharged into a river about 0.5 km downstream from an outfall (discharge) coming from a desalination plant. Upstream of the desalination plant's outfall the river has a flow of 17.8 m3/sec and a total dissolved solids
What are the final concentrations of no no2 and o3 : A dark atmosphere initially contains no ozone (O3), 100 ppb NO, and 100 ppb NO2. The sun comes comes out and the photostationary state relationship below is achieved in a few minutes. What are the final concentrations of NO, NO2 and O3?
Determine the minimum radius of the new curve if the safe : A curve of radius 300 ft and e = 10% is located at the section of an existing rural highway, which restricts the safe speed at this section of the highway to 40% of the design speed.
Find the theoretical carbonaceous oxygen demand : Suppose a ponds water contains 10.0 mg/L of some algae, which can be represented by the chemical formula C6H15O6N. Using the following reactions:

Reviews

Write a Review

Civil Engineering Questions & Answers

  How far back from the front axle would the center of gravity

how far back from the front axle would the center of gravity have to be to ensure that the maximum tractive effort developed for front- and rear- wheel-drive options is equal (assume that all other variables are unchanged)

  Determine the value for cu and the cohesion intercept c

At failure, the respective minor and major principal stress values are 20 kPa and 46 kPa for one and 40 kPa and 80 kPa for sample two. From these data, determine the value for (phi)cu and the cohesion intercept c on the Mohr's circle shear stress ..

  What torque is required to drive the disk at 760 rpm

A flat disk spins within an oil-filled enclosure. Clearances between the enclosure to both sides of the disk is 2.3 mm. The disk surface (area subject to shear) extends from radius 10mm to 90 mm

  Determine the maximum compression of the spring mounted

The 30-Mg freight car A and 15-Mg freight car B are moving toward each other with the velocities VA= 20 km/h to the right and VB= 10 km/h to the left. the spring constant on car A is k= 3MN/m.

  What would be the semi-annual cash payments that the city

A circular sewer with a 1.5m inside diameter is designed for a flow rate of 15m^3/s when flowing full. Assume that the Manning roughness coefficient and Darcy friction factor are constant with depth of flow. The flow rate when the depth of flow is 0...

  How to design a simply supported rectangular concrete beam

How to design a simply supported rectangular concrete beam havingcross section of 20 mm by 40 mm and a length of 3 meters that couldcarry a uniform load of 1000 KN.

  Determine the velocity of each ball after impact

Two identical pool balls of 57.15 mm diameter may move freely on a pool table. Ball B is at rest and ball A has an initial velocity v=v0i. (a) knowing that b=50 mm and e=0.7, determine the velocity of each ball after impact.

  What is the maximum number of phases that may be present

For a ternary system, three components are present; temperature is also a variable. What is the maximum number of phases that may be present for a ternary system, assuming that pressure is held constant

  Calculate the percentage change in volume based on volume

The natural water content of a saturated soil is 41% and its shrinkage limit = 20%. Gs (sp. gravity of solids) = 2.75. Calculate the percentage change in volume based on its volume at its natural water content if the soil is dried to a water conte..

  Calculate the final pressure temperature when the nitrogen

Calculate the final pressure, temperature when the nitrogen isreduced to that volume. What is the modulus of elssticity at thebeginning and end of the compression. k=1.4

  Determine the maximum tensil and compressive stresses

the vertical portion of the press shown below consists of rectangle tube of wall thickness t=8mm. knowing that the press has been tightened on wooden planks being glues together until P = 20 kN,

  Determine the post construction vertical stress imposed

Determine the preconstruction and post construction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd