The face of a 100m wide rectangular dam is built at an angle of 60 degrees above the horizontal and holds back a body of fresh water that is 30m deep at the face of the dam. Assuming hydrostatic conditions, what angle would be needed in order for an equivalent body of salt water to exert the same force on the dam? Assume the density of fresh water to be 1000kg/m^3 and the density of salt water to be 1030kg/m^3 .
A hi-vol clean filter weighs 18.00 g. After a 24 hour sampling period the filter is removed and weighs 18.65 g. The initial flow rate through the filter was 2.5 m3/min. When the filter was removed the flow rate through the filter was 1 m3/min. What i..
Three-ply asphalt felt and gravel roof over 2in of insulation board is supported by 18in deep precast reinforced concrete beams with 3ft wide flanges. If insulation weights 3lb/ft 2 and the asphalt roofing weights 5.5lb/ft2, determine the total dea..
ship A leaves port sailing in a direction 60 degree C north of due east and sails for 12 hours at 10 knot . Sheep B leaves the same port 3 hours later and sails due east at 25 knot for 9 hours.
Calculate the length of 10 equal-sized aeration basins for secondary treatment of a wastewater flow of 10 MGD with 20,000 lb of BOD per day for a conventional activated sludge process with a maximum loading of 40 lb BOD/ 1000 ft3*d.
A suburban street receives storm water runoff at a rate of 2.0 L/m-s (one each side). the street has a slope of .8 percent and a cross slope of 2 percent, n = .013.
On a certain highway a -6% grade meets a +2% grade at station 70 + 00, elevation 550.97 ft. An equal tangent vertical curve, 800 ft. long, is to be installed to connect these two grades.
The force of the resulting water jet physically knocks the mildew off. Estimate the maximum force (lbs.) that a water jet from a powerwaher can make on a glass window.
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions. The average haul speed will be 14 mph and the average return speed will be 20 mph.
Write a paper on steel sustainability.
Determine the actual detention time observed in the field of two circular settling tanks with depth 3.5 m that was designed to have an overflow rate not exceeding 60 m3/m2-day and a detention time of at least 2 hour.
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
Use the same conditions as (a), except a rainstorm covers the TCE with 1 cm of water. Assume TCE dissolves into water and quickly reaches equilibrium with the water.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd