How many cubic meters of borrow pit material is needed

Assignment Help Civil Engineering
Reference no: EM13564963

Q. A Proctor compaction test in the laboratory on a borrow pit soil gives a maximum dry unit weight of 19 kN/m3 and optimum water content of 11.5%. The bulk unit weight and water content of the soil in the borrow pit are 17.2 kN/m3 and 8.2%, respectively. A highway fill is to be constructed using this soil. The specifications require the fill to be compacted to 95% Proctor compaction.

(a) How many cubic meters of borrow pit material is needed for 1 m3 of highway fill?

(b) The water content at 95% compaction is 11% on the dry side and 12% on the wet side of the compaction curve. What is the minimum additional weight of water per unit volume to achieve 95% Proctor compaction?

(c) If the soil is compacted on the wet side, what will be the additional weight of water per unit volume to achieve 95% Proctor compaction?

(d) How many truckloads of soil will be required for a 100,000 m3 highway embankment if each truck has a capacity of 12 m3?

Reference no: EM13564963

Questions Cloud

Determine the thickness of the oil film assuming a linear : A solid cube with a side length of 0.4 ft and a weight of 110 lb slides down a smooth surface that is inclined at 45 degrees to the horizontal. The block slides on a film of oil with a viscosity of 1.85 x 10-2 lb-s/ft2. If the velocity of the block i..
What is the diameter of the capillary tube assuming it has : You are designing a new thermometer using Galinstan, an alloy of gallium, indium, and tin that is a liquid at normal living temperatures. The coefficcient of thermal expansion is 190*10^-6 (1/kelvin).
What percentage of the time will the through lane adjacent : A traffic engineer is trying to design a left turn bay on an EB approach to an intersection. The signal timing for left turns will have 10 seconds of “left turn only” green time and 50 seconds of red time each signal cycle. The green time will be suf..
Estimate the evaportranspiration losses for the area : Adriana wishes to accumulate $2,020,000 in 35 years. If 35 end-of-year deposits are made into an account that pays interest at a rate of 7% compounded annually, what size deposit is required each year to meet Adriana's stated objective?
How many cubic meters of borrow pit material is needed : The water content at 95% compaction is 11% on the dry side and 12% on the wet side of the compaction curve. What is the minimum additional weight of water per unit volume to achieve 95% Proctor compaction?
What is the concentration of residual nh3 in the aqueous was : Waste dairy whey is used to grow Kluyveromyces fragilis yeast in a continuous culture system operated at 30C and 1 atm pressure. Medium containing 4% w/w lactose (C12H22O11) and 0.15% w/w NH3 flows into a specially designed aerated bioreactor at a ra..
Determine the upstream depth of flow in a subcritical : Determine the upstream depth of flow in a subcritical transition from an upstream rectangular flume that is 49ft wide to a downstream trapezoidal channel with a width of 75ft and side slopes
How much would the volume of 1m^3 of water at 20c : Water is weakly compressible but often assumed incompressible; check the validity of this assumption. Using Table 3.1.2 in the text, how much would the volume of 1m^3 of water at 20C change if subjected to the pressure exerted by a 70m column of wate..
What angle would be needed in order for an equivalent body : The face of a 100m wide rectangular dam is built at an angle of 60 degrees above the horizontal and holds back a body of fresh water that is 30m deep at the face of the dam

Reviews

Write a Review

Civil Engineering Questions & Answers

  Write mass balance equation for an ideal 1d plug-flow stream

Assume the rate constant for BOD decay is 0.2 d^-1, the mean velocity of the stream is 0.5 m s^-1, and the initial concentration is 100 mg L^-1 at x=0. Plot the resulting concentration with downstream distance x in km.

  Determine the corresponding constant rate of acceleration at

If the maximum total acceleration of the train must not exceed 1.5 m/s^2, determine the shortest distance in which the train can reach a speed of 72 km/h, and determine the corresponding constant rate of acceleration at.

  Determine average time in the queue and in the system

The time between truck arrivals at the station is exponentially distributed with a mean arrival rate of 1.5 veh/min. the time it takes vehicles to be weighed is exponentially distributed with a mean rate of 2 veh/min.

  What is the maximum feed rate that can be accommodated

Vapour from the second effect is condensed at a pressure corresponding to 325 K. The heat transfer area is 10 m2 and the overall heat transfer coefficients are 3 and 2 kW/m2 in the first and second effects respectively.

  What is the settling velocity of a micrometer silica sphere

What is the settling velocity of a .5 micrometer silica sphere at 20 degrees Celsius and an ambient pressure of 150 kPa. The density of silica is 2600 kg/cubic meter.

  Determine magnitude of velocity and acceleration of particle

The motion of a particle on the surface of a right circular cylinder is defined by the relations, R = A, theta = 2pi(t), and z=Bsin(2pi)(nt), where A is a constant. Determine the magnitudes of the velocity and acceleration of the particle at any t..

  Compaction degree by freezing

We would continue embankment work even if winter season and my question is what is swelling amount of compacted soil for 30cm thickness and 95% compaction degree by freezing.

  Calculate the discharge in each pipe and the pressure

Two reservoirs are connected with a 30" diameter pipe with a length of 19,680 ft. The water surface elevation in the upper reservoir of the upper reservoir is 984 ft, lower reservoir 886 ft and the elevation at the midpoint is 918 ft.

  Find the linear velocity of the lifter with respect to point

A circular cam is in contact with a rectangular lifter and used to intermittently operate a piece of equipment at the end of a lifter arm. The lifter is constrained to move only in the vertical direction. The cam has a radius of r = 7.2in and is rota..

  Determine the components of the 800 lb force f along axes

determine the components of the 800 lb force f along the oblique axes a and b. also, determine the projections of f onto the a and b axes

  Projectile shot vertically upward

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  The campus would like to recoup the total construction cost

A parking facility on a campus was recently opened to faculty,staff and students.It cost a total of $ 300,000 to construct the facility. It is expected that thefacility will require no maintenance for the first 2 years ofoperation.At end of year 3, t..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd