Treat for a capacity of 100 MGD.
Although primary and secondary sedimentation is responsible for the removal of some BOD, you will design a bioreactor which removes 85% of BOD entering the plant using an activated sludge bioreactor. Use the following values: Influent (to bioreactor) BOD5 = 400 mg/L; Ks = 60 mg BOD5/L; kd = 0.06 day-1; µm = 3 day-1; Y = 0.6 mg VSS/mg BOD5.
(a) What must the hydraulic detention time be in the aeration pond?
(b) What mass of microbes will be produced in the pond each day?
Determine the chemical oxygen demand (COD) of a mixture of 250 mg/l glutamic acid (C5H10N2O3) and 200 mg/l of glucose(C6H12O6).
A river is 6m deep. The riverbed material has a saturated unit weight of 19.5kN/m3. What is the effective vertical stress 12m below the water surface. Assume the water is static and assume a datum at the water surface.
At a certain location along the span, a reinforce concrete beam section with d=14 in. and b=10 in. is subject to a design shear of Vu=50k. Using No.4 stirrups, compute the required stirrup spacing at the given location. assume F'c=3 ksi and Fy=40 ..
the rig shown consists of a 1200-lb horizontal member abc and a vertical member dbe welded together at b. the rig is
Determine the quantity of lime and soda ash required to soften 1 mgd of the following water. Plan to achieve a hardness of 40 mg/L as CaCO3. Note that an excess of 35 mg/L of lime (CaO) is required to achieve 40 mg/L as CaCO3.
what are two or three quality management tools used in data collection? what types of quality management tools do you
A water contains contains 2.0 meq/LCa2+ and 1.3 meg/L Mg2+. If one wanted to remove the hardness species by hydroxide precipitation, to what pHmust the water be raised and maintained in order for both calcium and magnesium toform hydroxide solids?
Design the ramp for the highest design speed (to the nearest 5 mph) without exceeding a minimum D of 8.0. (Assume the PC of the horizontal curve is at station 15+00, and the vertical curve PVIs are at the PC and PT of the horizontal curve). Maximu..
A concrete mix with a 3 inch slump, w/c ratio of 0.50, and sand with a fineness modulus of 2.4 contains 1.700 lb/yd^3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.
A reverse osmosis plant desalinates 5X10^6 L/day of feedwater containing 1500 mg/L of salts, yielding 3X10^6 L/day of product water with 75 mg?l of salt. What would the salt concentration be in the brine?
A full tank (3 m height) discharges water from an output pipe following the equation: W_out = A z^1/2. Calculate the time required to reduce the level to 1 m. Data: A _s = 1 m^2, A = 0.2777 kg (s m^1/2), density water = 1000 kg/m^3
Determine the magnitude and direction of the force P in so that the resultant of P and the 900N force is a vertical force of 2700N directed downward using.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd