What do you think mcnerney should do as an overall scheme

Assignment Help Project Management
Reference no: EM133982422

Assignment:

Case Incident

Boeing Dreamliner: Engineering Nightmare or Organizational Disaster?

As a flight of imagination, Boeing's 787 Dreamliner was an excellent idea: made of composite materials, the plane would be lightweight enough to significantly reduce fuel costs while maintaining a passenger load up to 290 seats. Airline carriers chose options from a long list of unprecedented luxuries to entice the flying public and placed their orders well ahead of the expected completion dates. And then the problems started.

An airplane like the 787 has a design about as complex as that of a nuclear power plant, and Boeing's equally complex offshore organizational structure didn't help the execution. Boeing outsources 67 percent of its manufacturing and many of its engineering functions. While the official assembly site is in Everett, Washington, parts were manufactured at 100 supplier sites in countries across the globe, and some of those suppliers subcontracted piecework to other firms. Because the outsourcing plan allowed vendors to develop their own blueprints, language barriers became a problem back in Washington as workers struggled to understand multilingual assembly instructions. When components didn't fit together properly, the fixes needed along the supply chain and with engineering were almost impossible to implement. The first aircraft left the runway on a test flight in 2009, but Boeing had to buy one of the suppliers a year later (cost: $1 billion) to help make the planes. The first customer delivery was still years away.

If Boeing and industry watchers thought its troubles were over when the first order was delivered to All Nippon Airways (ANA) in 2011, three years behind schedule and after at least seven manufacturing delays, they were wrong. Besides the continuing woes of remaining behind schedule (848 planes have been ordered but only 6 percent have been delivered), Boeing's Dreamliner has suffered numerous mechanical problems. After the plane's technologically advanced lithium-ion batteries started a fire on one aircraft and forced another into an emergency landing in January 2013, ANA and Japan Airlines grounded their fleets. The FAA followed suit, grounding all 787s in the United States. The remaining 50 flying Dreamliners worldwide were then confined to the tarmac until a solution could be found.

While Boeing's CEO Jim McNerney says he is "confident we'll identify the root cause," it's difficult to know what he thinks will fix the Dreamliner's operational problems, chief among them the battery crisis. On the one hand, McNerney is a proponent of Six Sigma and other statistics analytics tools used to streamline production to exacting standards, so it is conceivable that he will try to apply standardization throughout the complex supply chain. He may also decide, along with his engineering team, that the long list of features complicates orders too much and therefore simplify the manufacturing process by eliminating options.

On the other hand, McNerney may approach this as an organizational structure problem, both at corporate headquarters and abroad. While he has been meeting daily with his top executives, there have been so many management changes during the 787's history that it would be difficult for him to identify responsibility for errors in order to make changes in the team or the organizational structure. For the work done abroad, McNerney might be looking to restructure reporting relationships in favor of smaller spans of control to heighten management accountability and tie suppliers to the organizational structure of corporate Boeing. Or he might be considering "reshoring" to bring manufacturing physically close to the final assembly site and under Boeing's control while centralizing the organization structure. If he doesn't do this for all components, he may continue to allow local suppliers to manufacture for Boeing, or he may follow current thinking that key components (generally, the most complex parts) should not be outsourced.

No matter what Boeing and McNerney decide, it is clear that the company must produce reliable aircraft consistently before worldwide government agencies will allow the planes to fly, which may be long before the public will consider trusting the safety of the Dreamliner.

Questions: Answer Each Question Fully with Detail.

1.) Do you think this is a case of the difficulty of launching new technology (there are "bugs" in any system), or one of an unsuccessful launch?

2.) What type of executive management structure do you think would be most conductive to getting the Dreamliner past the battery problem and back in flight? Is this a different structure than you would suggest for fixing the ongoing manufacturing problems? Sketch out the potential design.

3.) What organizational structure would you suggest to effectively tie in Boeing's managers and suppliers abroad? Sketch your ideas. (Goals for managers might include facilitating teams, coordinating efforts, maintaining organizational transparency, and creating conversations.)

4.) What do you think McNerney should do as an overall scheme?

Reference no: EM133982422

Questions Cloud

Asthma and chronic obstructive pulmonary disease : Explain to your colleagues the difference between asthma and chronic obstructive pulmonary disease. What risk factors are involved with COPD,
Qualitative data is descriptive and conceptual findings : Qualitative data is the descriptive and conceptual findings collected through questioners, interviews and observations.
Why is it important in project management : Why is scope definition important? What is a WBS and why is it important in project management?
Specific patient education based on prescribed therapy : What are the parameters for monitoring the success of your selected therapy? Discuss specific patient education based on the prescribed therapy.
What do you think mcnerney should do as an overall scheme : What organizational structure would you suggest to effectively tie in Boeing's managers and suppliers abroad? Sketch your ideas.
Elderly person or person with long-term condition : You are required to identify two personal experiences of caring for an elderly person or a person with a long-term condition.
How is the Nursing Scope-Standards of practice followed : How are ethical principles adhered to when creating EBP guidelines? How is the Nursing Scope and Standards of practice followed when implementing EBP?
Covers general principles of nursing leadership : The Denver College of Nursing MSN curriculum includes a leadership class that covers general principles of nursing leadership.
Chronic Kidney disease : What recommendations would you make for someone with CKD (chronic kidney disease) who is on calcium-based phosphate binders

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd