What can you use to support your arguments

Assignment Help Project Management
Reference no: EM131469674

Assignment

There are 2 basic types of contracts: the fixed-price contract and the cost-plus contract. Each has several common variations. It is not unusual for any specific contract to have special terms and agreements, so the basic contract is just the starting point. The project manager is most interested in the terms that define and help to control costs, schedule, and quality.

Among the different types of contracts, which contracts do you think would be easiest for ADC to manage, and why? Which contracts would be the most difficult for ADC to manage, and why?

Examples of the contract types include the following:

• Firm fixed price
• Fixed price with targets
• Fixed price at cost
• Time and materials
• Cost sharing
• Cost plus

Respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to reinforce your ideas:

• Which types of contracts do you think would be easiest for ADC to manage? Why?
• Which types of contracts would be the most difficult for ADC to manage? Why?
• What specific challenges do you think ADC would face when selecting the ideal type of contract?
• What would you do personally to avoid or overcome these challenges?
• What can you use to support your arguments?

Attachment:- Project_Sernireo.rar

Reference no: EM131469674

Questions Cloud

Develop an activity relationship chart for four departments : A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech firms in southern California.
Circuit analysis of a circuit using laplace transforms : Circuit Analysis of a circuit using Laplace Transforms - determine the voltage across the two capacitors, v1(t) and v2(t).
Explain how federal reserve operates in the united states : Explain how Federal Reserve operates in the United States. What is the function of the FED? How does the FED support the banking system of the United States.
Find the location of the centroid of this facility : A facility has the shape shown in Figure. Using the methods described find the location of the centroid of this facility.
What can you use to support your arguments : Fixed price with targets- What would you do personally to avoid or overcome these challenges? What can you use to support your arguments?
Find the layout to minimize total materials handling costs : An initial layout for four departments and from-to charts giving distances separating departments and unit transportation costs appear in Figure.
Determine the scope of district four production warehouse : Review the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case.
Construct the final dataset : The data preparation phase covers all activities to construct the final dataset (data that will be fed into the modeling tool(s)) from the initial raw data
Find the layout recommend by craft for department b c and e : An initial layout for five departments and a from-to flow data chart are given in Figure. Assuming that departments A and D are in fixed locations.

Reviews

Write a Review

Project Management Questions & Answers

  Project timelines critical path and pertyou are the general

project timelines critical path and pertyou are the general manager of a large construction project. the contract has

  Calculate schedule variance and schedule performance index

Calculate the schedule variance, schedule performance index, and cost (actually value in this case) performance index. How is the project going?

  Create awareness of the organisation

An awareness campaign to raise the profile of CSC within the local community. This will be particularly targeted towards industry in the area with a view to soliciting financial and other support - The CSC provide emergency support to those who fin..

  Collaborative project procurement arrangements

Discuss the collaborative project procurement arrangements, its needs and advantages compared to the traditional procurement system. Give examples of the project collaborative arrangements procurement?

  What happened to the corporate culture

Could you have anticipated that these results would have occurred? What happened to the corporate culture? Can project management practices be improved with a major repair to the corporate culture

  What elements of effective teamwork are not covered

What elements of effective teamwork are not covered in this type of training? - Do you think the training as currently offered also applies to virtual teams?

  What type of negative risk response strategy is this

The project manager decides to not upgrade to the new, unfamiliar operating system until the ongoing IT project is completed. What type of negative risk response strategy is this

  Level of outsourcing to international subcontractors

What are the reasons for the increasing level of outsourcing to international subcontractors?- Explain the shift from seller to buyer initiative in subcontracting.

  Solve the given problem by using the assignment method

Assign the squads to the above cases, but with the constraint that squad 5 cannot work on case E because of a conflict.

  Results to each partner for tax purposes

How must the Triple-A Steak House report its results to each partner for tax purposes?

  Big dig in boston is the big dig the new way engineering

is the big dig the new way engineering projects must be planned in the 21st century? its advocates say it is not too

  Plan for the denver international airport project

Installation of a baggage handling system (BHS) was an important part of the plan for the Denver International Airport (DIA) project.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd