Question 1which one of the following statements about

Assignment Help Computer Networking
Reference no: EM13383166

Question 1

Which one of the following statements about lot-sizing rules is TRUE?

The periodic order quantity (POQ) rule seeks to create inventory remnants.

If the POQ rule is used, an item's lot size can vary each time an order is placed.

The lot-for-lot (L4L) rule is a special case of the fixed-order quantity (FOQ) rule.

All lot-sizing rules seek to minimize inventory levels.

Question 2

MRP explosion means estimating the total number of:

subassemblies, components, and raw materials needed for each parent item.

raw materials to be purchased from all suppliers.

parts to be produced for each parent item.

parts needed to be produced less the number of parts on hand for each parent item.

Question 3

Which one of the following is a feature of MRP II, but not available in basic MRP systems?

Financial reporting

Action notices

Dispatch lists

Capacity reporting

Question 4

The Big Mistake Company uses an MRP system. However, the company's database contains many inaccuracies. Which type of inaccuracy is most likely to result in incorrect planned order release quantities for its dependent demand items?

Incorrect routings

Incorrect bills of materials

Incorrect cost and pricing data

Incorrect machine capacity data

Question 5

Which of the following statements on MRP is TRUE?

The payoffs from MRP tend to be greater when there are more BOM levels and larger lot sizes.

When MRP systems are enhanced to include financial reporting, they are called basic MRP systems, or "little mrps."

The fixed-order quantity (FOQ) eliminates remnants.

MRP is an inventory control system that derives the gross requirements of the end items from purchase commitments with vendors.

Question 6

Use the following MRP record to answer the question.

1081_What will be the projected on-hand inventory quantity.png

What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1, 2, 3, 4, 5, and 6)?

35, 0, 0, 60, 0, 0

35, 0, 60, 0, 0, 0

5, 30, 0, 40, 20, 0

35, 0, 0, 40, 20, 0

Question 7

Table

2254_What will be the projected on-hand inventory quantity1.png

Use the information in Table. In which week will the second planned order release occur?

Week 1

Week 2

Week 3

Week 4, 5, 6, 7, or 8

Question 8

Use the following MRP record to answer the question.

2170_What will be the projected on-hand inventory quantity2.png

What will be the projected on-hand inventory quantity in week 7

Fewer than or equal to 30 units

Greater than 30 units but fewer than or equal to 60 units

Greater than 60 units but fewer than or equal to 90 units

Greater than 90 units

Question 9

Use the following MRP record to answer the question.

2234_What will be the projected on-hand inventory quantity3.png


Which one of the following statements about item QRS is TRUE?

Two order releases are needed.

The first planned receipt occurs in week 1.

The second planned order release quantity is 90 units.

The total planned order release quantity (summing up all eight weeks) is 190 units.

Question 10

Table

Consider the following MPS, BOM, and inventory data. A blank MRP record is shown below.

986_What will be the projected on-hand inventory quantity4.png

Master Production Schedule: The following table shows the MPS start quantities.

129_What will be the projected on-hand inventory quantity5.png

Bill of Material

Selected Inventory Data

974_What will be the projected on-hand inventory quantity6.png

Use the information in Table. Which one of the following statements about item C is TRUE?

It has a planned receipt of 80 units in week 3.

Its second planned order release is for 200 units in week 3.

It has a planned receipt of 180 units in week 6.

Its first planned order release is for 130 units in week 1.

Question 11

1.

Consider the following MPS, BOM, and inventory data. A blank MRP record is shown below.

2260_What will be the projected on-hand inventory quantity7.png

Master Production Schedule: The following table shows the MPS start quantities.

610_What will be the projected on-hand inventory quantity8.png

Bill of Material

Selected Inventory Data

1169_What will be the projected on-hand inventory quantity9.png

Use the information in Table 15.2. Which one of the following statements about item F is TRUE?

The first planned order release is for 205 units in week 3.

There will be exactly one action notice, which calls for the delay of the scheduled receipt until week 2.

There will be exactly one action notice, which calls for the release of a new order.

Both 2 and 3 are correct.

Question 12

Table

136_MRP record.png

Use the information in Table. Which one of the statements concerning item RST is TRUE?

The first planned receipt occurs in week 5.

There is an action notice needed to expedite the schedule receipt by one week.

The planned receipt in week 7 is 80 units.

There are exactly two planned order releases needed.

Question 13

Use the following MRP record to answer the question.

1961_MRP record1.png
Which one of the statements concerning item LMN is TRUE?

There will be exactly two action notices needed.

The planned order release quantity in week 4 is 80 units.

The planned receipt quantity in week 6 is 30 units.

The projected on-hand inventory in week 8 is 70 units.

Question 14

Table

36_MRP record2.png

Use the information from Table. If an FOQ of 75 units is used, how many planned order releases are there for item XYZ?

Zero or one

Two or three

Four or five

More than five

Question 15

349_MRP record3.png

Use the information from Table. If a POQ lot-sizing rule is used, where P = 3, how many planned order releases are there for item XYZ?

Zero or one

Two or three

Four or five

More than five

Question 16

Management wishes to use a POQ lot-sizing rule for an item that experiences an average demand of 30 units per week. If the desired average lot size is 120 units, what should P be?

Zero or one weeks

Two or three weeks

Four or five weeks

More than five weeks

Question 17

Case Study

Sunshine Manufacture produces three products: X, Y, and Z. The production of these end items is controlled by an MRP system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled with two components of C and one component of A. End item Z is assembled from one unit of D and one unit of C; D is manufactured from one unit of A; and C is manufactured from one unit of B.

Use the information in Case Study. If level-by-level processing is used, what is a correct order for processing components A, B, C, and D?

2126_record.png

Question 18

Table

403_MRP record4.png

Viola Products produces one item with the following bill of materials

1059_MRP record5.png

A recent check of their inventory reveals the following quantities on hand.

Use Table to answer this question. How many additional units of D are needed to produce 20 end items?

Fewer than 75

More than 75 but fewer than 95

More than 95 but fewer than 115

More than 115

Question 19

Table

740_MRP record6.png

Viola Products produces one item with the following bill of materials

1620_MRP record7.png

A recent check of their inventory reveals the following quantities on hand.

Use Table to answer this question. How many additional units of H are needed to produce 20 end items?

Fewer than 250

More than 250 but fewer than 350

More than 350 but fewer than 450

More than 450

Question 20

Table

595_MRP record8.png

Viola Products produces one item with the following bill of materials

540_MRP record9.png

A recent check of their inventory reveals the following quantities on hand.

Use Table 15.5 to answer this question. How many additional units of G are needed to produce seven end items?

0

11

22

33

Question 21

Viola Products produces one item with the following bill of materials

1162_MRP record10.png


A recent check of their inventory reveals the following quantities on hand.

816_MRP record11.png

Use Table to answer this question. How many additional units of J are needed to produce seven end items?

25

36

47

58

Question 22

Which of the following is NOT used to derive an item's gross requirements?

The MPS for immediate parents that are end items

The planned order releases for parents below the MPS level

The MPS components that are not purchased items

Any other requirements not originating in the MPS, such as the demand for replacement parts

Question 23

A technique used for projecting time-phased capacity requirements for workstations is called:

capacity requirements planning.

time-adjusted output control.

input-output control.

work center planning.

Question 24

Which of the following uses of MRP in promoting a healthy environment is NOT used?

An MRP system can track waste in a bill of materials as a component of an item.

When the master production schedule is developed for a product, reports can be generated that project the quantity of waste.

When the master production schedule is developed for a product, reports can be generated that project the timing of waste.

The MRP system can be used to communicate directly with the International Organization for Standardization to file ISO 9000 documentation.

Question 25

In terms of resource planning, service goods must focus on maintaining:

dependent demand levels at a maximum.

capacity to serve customers.

off-line resources in order to serve customers.

independent demand resources at a maximum.

Question 26

An example of a dependent demand item in a service is a:

menu in a restaurant.

jukebox in a club.

operating suite at a hospital.

a pilot's checklist for an airline.

Question 27

The service analogy to the bill of materials in a manufacturing company is the:

bill of resources.

bill of services.

bill of sub-services.

bill of tender.

Reference no: EM13383166

Questions Cloud

A determine what variables explain likelihood of passing : a determine what variables explain likelihood of passing to each stage of funneli inquire for information ii attend
Task write a one page paper summarizing your thoughtscase : task write a one page paper summarizing your thoughts.case. what is going on here?art margulis is the 45-year-old
Tasknbsp write a one page paper summarizing your : tasknbsp write a one page paper summarizing your thoughts.bob pierce a gentle man of about 50 is the president of abc
You are required to develop a social marketing plan for a : you are required to develop a social marketing plan for a social marketing problem and organisation of your choice.
Question 1which one of the following statements about : question 1which one of the following statements about lot-sizing rules is true? the periodic order quantity poq rule
Question 1 ten high-technology batteries are tested for 200 : question 1 ten high-technology batteries are tested for 200 hours each. one failed at 20 hours all others completed the
Question 1 a member of a project team that is implementing : question 1 a member of a project team that is implementing a new credit card payment process at a bank has direct
Write a report based on a management issue or potential : write a report based on a management issue or potential issue which they identify in the nominated case study on
Q1 define each of the following - pharmacokinetics - : q1 define each of the following - pharmacokinetics - pharmacodynamics - pharmacotherapeutics - toxicology q2common

Reviews

Write a Review

Computer Networking Questions & Answers

  Design an algorithm to achieve the byzantine agreement for

design an algorithm to achieve the byzantine agreement for the case that there are four processes amongst which one is

  Compute maximum throughput rate-host can achieve in network

Consider a 100mbps token ring network with 10 stations having a ring latency of 50¹s. Calculate the maximum throughput rate that one host can achieve in the network.

  Building a payroll program for a large organization

Application Architecture. You have been tasked with building a payroll program for a large organization with offices spread across the United States.

  How many users can be supported if circuit switching is used

Suppose users share a 1Mbps link. Also suppose each user requires 100Kbps when transmitting, but each user transmits only 20% of the time. When circuit switching is used, how many users can be supported?

  Bull an application on computer a in network 1 is sending a

bull an application on computer a in network 1 is sending a message to an application on computer b in network 2.nbsp

  How many times message m is modified before destination

When a message travels from source to destination through two routers, how many times the message M is modified before it reaches to the destination as M. Show your work to determine this number.

  Sketch the existing wan

What is the maximum data capacity for traffic between Hornsby and North Ryde? What is the maximum data capacity for traffic between Hornsby and the City store? [Short answer]

  A company has current assets that have an estimated book

a company has current assets that have an estimated book value if sold of 20 million.the fixed assets book value is 120

  Determine minimum number of bits for sequence number

Suppose that each frame carries 1Kbytes of data, determine minimum number of bits you require for the sequence number?

  Factors for moving wireless nics into more dominant role

Explain whether this is still true today, and write down factors are moving wireless NICs into more dominant role, if any.

  Advantages and disadvantages of connection method

Prepare a three-column table (one column for each technology) in which you list the advantages and disadvantages of each connection method.

  Why does http at the application layer uses tcp

Why does HTTP at the application layer uses TCP while DNS uses UDP when it passes its message packet with overhead to the Transport Layer and then hand it off to the Network Layer?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd