Prepare a work breakdown structure and project schedule

Assignment Help Project Management
Reference no: EM131587789

Assignment

Description

Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario. The WBS and resultant schedule should contain the following high-level activities:

o 1.0 Evaluate User & System Requirements

o 2.0 Evaluate ODHS Network Suitability

o 3.0 Conduct E-mail System Selection

o 4.0 Upgrade ODHS Network & Hardware

o 5.0 Develop E-mail Training

o 6.0 Deploy E-mail System

Each of the six WBS elements should be decomposed into two or more activities; additionally, three of these six elements should be decomposed into a third level consisting of at least two more activities. Thus, there should be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Use the format described above to define the activities (action verb followed by subject, such as Deploy E-mail System).

The Gantt chart should be developed based on the WBS (all activities should be detailed on the Gantt chart). The Gantt chart should reflect the proper dependencies of each of the activities (for example, you can't have "Deploy E-mail System" before "Evaluate User Requirements"). For activity duration, provide a reasonable estimate of the time you expect each activity to take; while students are not expected to provide accurate durations, durations should be reasonably defensible and logical. For formatting ease, high level activities should be left justified while second and third level activities should be indented below their parent activities.

Reference no: EM131587789

Questions Cloud

How did you determine whether an article was relevant : If you had any trouble evaluating research, use this discussion to receive support from your peers and instructor to work through your challenges.
Explain the rationale for utilizing probability concepts : Explain the rationale for utilizing probability concepts. Is there more than one type of probability? If so, describe the different types of probability.
Prepare a flowchart of the back-stage : HC2112 Services Marketing & Relationship Marketing Assignment - Reflective Essay. Prepare a flowchart of the back-stage as well as the front-stage operations
Would we describe this linear relationship : Suppose that you are reviewing a table of data from a study. It's stated that the table of data represents a linear relationship.
Prepare a work breakdown structure and project schedule : Prepare a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario.
Combinational subcircuits for the inputs : Then modify the combinational subcircuits for the inputs to the flip-flops and the outputs with the appropriate gates of a Moore sequence detector.
Discuss the conclusions you arrive at from passage : Write a paper of 1000-1250 words and discuss the conclusions you arrive at from each passage. Conclude the paper with a summary
What does the standard error of estimate measure : What does the Standard Error of Estimate (SEE) measure and what can this tell us about how well our linear regression models data?
What are the key performance indicators : Define QoS. Which layer(s) carry out QoS execution? What are the Key Performance Indicators (KPI's) for QoS?

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd