The two I-beams are welded together and are initially supported by the three cables of equal length hanging vertically from supports directly above A, B, and C. When applied with the appropriate offset d, the P = 250 N force causes the system to assume the new equilibrium configuration shown. All three cables are inclined at the same angle ? from the vertical, in planes parallel to the y-z plane. Determine this deflection ? and the proper offset d. Beams AB and OC have masses of 78 kg and 50 kg, respectively. The mass center of beam OC has a y-coordinate of 725 mm.
Three streams of polluted air are combined prior to treatment in an electrostatic precipitator (ESP). The flow and particulate concentration of each stream are 600 cfm at150 mg/m^3, 700 cfm at 200 mg/m^3, and 500 cfm at 1000 mg/m^3.
The concrete girder supports the two column loads. If the soil pressure under the girder is assumed to be uniform, determine its intensity w and the placement d of the column at B. Draw the shear and moment diagrams for the girder.
For the eccentric shear loading of the accompanying figure, 7/8 inch diameter A325 bolts are used in two vertical lines in a bearing-type (A325-X) connection. The loading is 10 kips dead load and 30 kips live load.
A space is at a temperature of 75 F, and the relative humidity is 45 percent. find the partial pressures of the air and water vapor
If the defect rate for the flash drivers is 0.5% and you randomly select four of them for inspection: a) What is the probability that none of them has a defect b) What is the probability that all four have a defect
A 3105 Aluminum alloy wire is to be drawn to give a 1-mm diameter wire having a yield strength of 20,000 PSI. assume that there is no friction in the wire drawing process
A dam spillway is to be tested using kinematic similitude (Froude scaling) with a 1:20-scale model. The model flow has an average velocity of 0.7 m/s and a flow rate of 0.06 m3/s.
A right-angle Cone, with base diameter 2.0m and height 2.45m, isinverted and fixed at the ceiling as shown in Figure 1. The floor height is 2.5m.
The behaviour of structural materials using comparative statement when they are formed into structural member
If A and B are both made of wood and are 3/8 in thick, determine to the nearest ¼ in the smallest dimension h of the support so that the average shear stress does not exceed \tauallow = 300 psi.
acetic acid is a weak acid. Its Ka is 1.8(10^-5). For a concentration of 0.015 M, calculate the pH.
What is the maximum safe speed around the curve? If the speed limit on the roadway is 60mph, what action should be taken by the engineer?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd