Determine the discharge along the gutter and calculate

Assignment Help Civil Engineering
Reference no: EM13560393

Two equations govern the flow of runoff on a slope. The first is the continuity equation (conservation of mass) and the second is an equation describing conservation of momentum. The continuity equation is just the water balance for the slope or any small portion of the slope and can be given as: p - fp = RO where i = rainfall rate, fp = infiltration capacity, and RO = runoff rate, all expressed as a depth per time, e.g. mm h-1 . Since Q= VA, the Q for each unit width = i*1*depth*length of slope. The momentum, or flow equation we often use is Manning's equation: V = 1.49 R2/3 S0.5.n

Application:

You have been asked to determine the rate and depth of flow from a parking lot at a shopping mall and recommend the size of the gutter needed to accommodate the runoff from the lot. The lot is 300 feet by 500 feet. The overland flow portion is the 300 feet and has a slope of 2.0%. Flow will enter the gutter along the 500 feet at the bottom of the overland flow. The gutter has a slope of 1.0 % and a rectangular cross section with a bottom width of 1.5 foot.

Determine the following:

1. The discharge, q, along the 300 feet of overland flow,

2. The depth, d, of flow along the 300 feet of overland flow, and

3. The discharge, Q, and depth of flow in the gutter.

Someone spills a container of gasoline at the farthest corner of the parking lot during the storm. Estimate the average time for the gasoline to reach the outlet of the gutter.

Procedure:

1. Use a 1/2-hour duration, 10-year recurrence interval storm for the exercise. Assume that the rainfall occurs at a uniform intensity during the 1 hour duration. You can use the IDF (Intensity-Duration-Frequency) curves for Region 2 in Precipitation in Connecticut available at www.ctiwr.uconn.edu under Publications/special reports. or https://digitalcommons.uconn.edu/ctiwr_specreports/36/ for the direct link.

2. Determine the discharge along the slope of the lot in cfs per foot of width across the lot for every 10 foot increment. Using Manning's equation, determine the depth of flow down the lot, i.e. from the top to the entrance to the gutter, again at 10 ft increments. The surface of the lot is older, rough asphalt which has an 'n' value = 0.10 for shallow flow. NOTE: this ‘n’ maybe higher than typically given, but we assume at first that the flow is very shallow.

3. Determine the discharge along the gutter and calculate the depth needed for the gutter at its outlet. The gutter is made from concrete which has an 'n' value = 0.04.

4. In the design of storm water control systems, engineers often will add "freeboard" to the calculated depth of a channel to account for blockage, changes in 'n', etc. Determine if 0.5 feet of added depth to the gutter will accommodate the 100-year, 1/2-hour storm.

5. Using the velocities calculated from Manning's, determine the time it takes for the gasoline to reach the outlet of the gutter. State any assumptions involved in your calculations.

Reference no: EM13560393

Questions Cloud

The nextgen air transportation system : Write a module case study regarding the NextGen Air Transportation System
What is the probability that the vehicle pulling out will : A vehicle pulls out onto a single lane highway that has a flow rate of 280 veh/h (poisson distributed). The driver of the vehicle does not look for oncoming traffic
What is the probability that the vehicle pulling out will : A vehicle pulls out onto a single lane highway that has a flow rate of 280 veh/h (poisson distributed). The driver of the vehicle does not look for oncoming traffic
Apply the concepts and techniques of the module : The purpose of the Final Project is to apply the concepts and techniques of the module to the analysis of real-world situations or problems. You will be expected to use diverse sources of information and to carry out an original analysis rather than ..
Determine the discharge along the gutter and calculate : Someone spills a container of gasoline at the farthest corner of the parking lot during the storm. Estimate the average time for the gasoline to reach the outlet of the gutter.
The situation analysis is essentially a process : The situation analysis is essentially a process of assessing the current situation facing the organisation, arriving at a set of assumptions about the future and identifying key strategic issues that are likely to confront the organisation". Based st..
Design a non-air-entrained concrete mix for a small job with : Design a non-air-entrained concrete mix for a small job with a maximum gravel size of 3/4". Show the results as follows:
Determine the displacement of the beam at each end : A rigid beam (AB), 12 feet in length, with a point load of 9 kips (4 feet from A) is resting on two short steel rods (AC & BD). Diameter of Rod AC is 1 inch, Rod BD diameter is 2 inches. Assuming no buckling in rods, Determine the displacement of the..
What are the strategic aims of the company : What are the strategic aims of the company?

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the expected annual savings and expected pw

An energy efficiency project has a first cost of $300,000, A life of 10 years, and no salvage value. Assume that the interest rate is 9%. The most likely value for annual savings is $60,000.

  Determine the available tensile strength in kips

Determine the available tensile strength (Pa) in kips to the 1st decimal point for the A36 steel plate in accordance to the 14th Edition of AISC LRFD Specifications. The bolts are in standard holes. U = 1.0

  Find the power delivered by the turbine for its efficiency

A turbine located 225 m below the water surface at intake, carries a flow of 3.5 m^3/s. The head loss in the pipeline leading to it is 10 m. Find the power (kW) delivered by the turbine if its efficiency is 92%.

  What is the shear strength in terms of effective stress

What is the shear strength in terms of effective stress on a place within a saturated soil mass at a point where the total normal stress is 295 kN/m2^2 and the pore water pressure 120 kN/m^2?

  Find what is angle aplha of slope for open rectangular tank

An open rectangular tank contains water up to about half its depth. this tank accerlerates at a=2.2m/s2 up a slope of alpha, which causes the free water surface to form an angle theta with the horizontal plane. what is angle aplha of the slope

  Estimate the hourly production and unit cost of rock

Estimate the hourly production and unit cost of rock excavation by drilling and basting. The rock is limestone having a seismic velocity of 6000 ft/s.

  What tensile force should be applied to the bar to maintain

Suppose that in an apparatus it is necessary to maintain precisely the cross section of a 20mm circular nickel steel bar. If this bar is heated to 200 deg Celcius

  Calculate the vertical stress at every combination of depth

A circular plate is loaded with a total load of 60 kips distributed uniformly over the surface at a pressure of 100 psi. Calculate the vertical stress at every combination of the following: (a) Depth: 12 and 50 (b) Radial distance from the center ..

  What is elevation of b by neglecting curvature and reaction

The line of sight of a level falls at a rate if 0.122ft/ 100 ft when the level bubble is centered. A backsight of 4.782 is taken on point A, which is at 75 ft from the level. the elevation of a is 425.238 ft.

  What error results from curvature and refraction

Successive plus and minus sights taken on a downhil line of levels are listed below. the values represent the horizontal distances between the instrument and either the plus or minus sights. What error results from curvature and refraction?

  How to select an appropriate w14 section

A 30 feet column is braced at the mid-section to prevent premature failure. If the maximum load is 380 kips, select an appropriate W14 section, if any, to support the loading conditions.

  Determine the velocity of the airplane

Instruments in airplane A indicate that with respect to the air the plane is headed 30 degrees north of east with an air speed of 480 km/hr. At the same time, radar on ship B indicates that the relative velocity of the plane with respect to the ship ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd