A vehicle pulls out onto a single lane highway that has a flow rate of 280 veh/h (poisson distributed). The driver of the vehicle does not look for oncoming traffic. Road conditions and vehicle speeds on the highway are such that it takes 1.5 seconds for an oncoming vehicle to stop once breaks are applied. Assuming a standard driver reaction time of 2.5 seconds, what is the probability that the vehicle pulling out will get in an accident with oncoming traffic?
coal has about 2% sulfur. How many kilograms of sulfur would be emitted from coal fired plints in the US in 1 yr US electricity production is about 0.28 * 10^12 watts, & coal has an energy content of about 30*10^6 J/kg
Find the derivative of the equations f(x)=cos(x) using the finite differencing methods and compare the error with the actual answer as a function of x in matlab
What is the peak discharge for an area with the following characteristics The rainfall intensity is 120 mm/hour. Land use Area, m2 Forest 10,000 Single family residential 9,000 Parking lots 5,000
A tank with a 3m diameter has an 8 cm orifice at the bottom. The tank is currently filled with water to a height of 2.5m above the orifice. If the orifice is opened.
You have batched both of the mixes you designed in questions 6 and 7 on the same day and have made a sufficient number of 6" diameter and 4" diameter cylinders of each mix so that two cylinders of each size
If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?
It accelerates wibt constant tangential accleration of at= 0.75 m/s^2. Determine the distance traveled and the time elasped when the magnitude of the car's totale acceleration is 0.9 m/s^2.
A flood control project has a construction cost during the first year of $10 million, during the second year $6 million, and during the third year $2 million. It is completed at the end of the third year and thereafter incurs an annual operating c..
A proposed embankment fill requires 8000 cubic meters of compacted soil. The void ratio of the compacted fill is specified as 0.7. Four borrow pits are available along with each of the respective void ratios along with the cost per cubic meter for mo..
Determine the centroid for the region bounded by the x-axis, the curve y=x^3, and the line x=3
The allowable stress in a steel shaft with an outside diameter of 1.5in and an inside diameter of 1.1in is 12,000psi. What hp can the shaft deliver at 1750rpm?
The cylinder B is released from rest. Determine the speed of both masses (vA and vB) after B moves by h m. Also calculate the angular displacement for the pulley D. The diameter of the pulley D is 0.2 m. Neglect all friction.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd