Two level sections of an east highway (G=0) are to be connected. Currently, the two sections of highway are seperated by a 4000-ft (horizontal distance), 2% grade. The westernmost section of highway is the higher of the two and is at elevation 100 ft. If the highway has a 60-mi/h design speed, determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft. In solving this problem, assume that the curve PVIs are at the intersection of G=0 and the 2% grade, that is , A=2.

Reference no: EM13562678

Questions Cloud

Determine the magnitude and coordinate direction angles : If the coordinate direction angles for F3 are a=120degrees, b=45degrees, y=60degrees, determine the magnitude and coordinate direction angles of the resultant force acting on the eyebolt.
When finding the projection of p onto q what do you do : Force P is directed from point A(5,10,3) towards point B(1,-2,5) and has a magnitude of 15N. Vector Q=6i+2j-5k. When finding the projection of P onto Q what do you do with the 15N?
Compare the performance reactors/reactor combinations : Assume that a chemical reaction involving the removal of a given contaminant follows first order kinetics. The rate constant, k, is 0.5 hr-1. Compare the performance of the following reactors/reactor combinations. Provide your comments your results. ..
Design a curve for the highway by computing the radius : A horizontal curve is being designed for a new two-lane highway(12-ft lanes). The PI is at station 250 + 50, the design speed is 65 mi/h, and a maximum superelevation of 0.07 ft/ft is to be used
Determine the crest and sag vertical curves required : Two level sections of an east highway (G=0) are to be connected. Currently, the two sections of highway are seperated by a 4000-ft (horizontal distance), 2% grade. The westernmost section of highway is the higher of the two and is at elevation 100 ft..
What is the elevation of the pvt : An equal-tangent crest vertical curve is designed for 70 mi/hr. The high point is at elevation 1011.4 ft. The initial grade is +2% and the final grade is -1%. What is the elevation of the PVT? Solve this problem with the parabolic equation rather tha..
What microbial mediated process do you suspect is occurring : You find a chlorine demand occurring in your drinking water distribution system (series of pipes that carry drinking water throughout a city), yet there is no increased chlorine demand in the water going through the treatment plant
Calculate the hp per foot of cutting edge ratio for all four : The Caterpillar D6R Series 3 and D8R tractors are rated, respectively, at flywheel horsepowers (fwhp) 0f 185 and 305. The “A,” “S,” and “SU” blade widths (length) for the D6R are S, 16 ft, 9 in.; A, 17 ft, 1 in.; and for the
What is the equivalent height of a water column : Tall buildings can develop a significant difference in pressure between the inside and the outside of the building. Air lock entrances are used at the ground level so the pressure at the ground floor is not the same as atmospheric pressure. Assume th..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the linear misclosure and relative precision

Balance by the compass rule the departures and latitudes listed in the following closed-polygon traverse. Calculate the linear misclosure, relative precision, and adjusted lengths and bearings

  Determine the value of po

Determine the value of Po, as a funciton of H, for these two investment alternatives to be equivalent at an interest rate of i=15% per year.

  What is the equivalent amount in year 10 of an expenditure

What is the equivalent amount in year 10 of an expenditure of $5,000 in year one, $8,000 in year two, and increasing by $1,000 per year through year 10 Assume the interest rate is 10% per year.

  What is the elevation of lower point

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and slope distance with 16m steel tape.

  Compare size of cmfr and pfr to achieve 50 percent

Compare the size of a CMFR (completly mixed flow reactor) and PFR (plug flow reactor) to achieve 50 percent removal of a contaminant, given a flow rate of 10^4 m^3/d and a first-order rate constant of -0.4/hr. Repeat for 99 percent removal.

  Describing the tribes history after contact including major

choose one 1 native american tribe residing within the continental united states lower 48 states at the time of first

  What is the true air speed

Given that an aircraft flying at FL350 encounters a tailwindof 35 knots and the instrument in the cockpit shows anindicated airspeed of 310 knots. What is the standard atmosphere atthis altitude?

  What do you think is the best ratio of b/y to use in your

A canal of rectangular cross-section and an n=0.030 is to be laid on a slope of 0.002 and is to carry a discharge of 30 m3/s. Calculate the cross-sectional area required for the channel to carry this flow based on the norma

  How efficient is the pump

A fireboat pump draws seawater (density=1.95 slugs/ft^3) from a 6 inch diamter submergred pipe that reaches 6 feet under the free surface and discharges 120 ft/s through a 2 inch diamter nozzle 10 feet above the free surface

  Calculate the energy needed to bring the soil

We are digging a hole to build a building. Calculate the energy needed to bring the soil to surface level. Remember the sides of the excavation lie at 45 degrees. Else, the whole would be constantly refilling itself.

  Find range of values of theta for which both cables are taut

A worker ties a rope oflength 12 m to he tower at A and exerts a constant force of 160 Non the rope. (a) Express the tension in each cable as a function oftheta knowing that the resultant of the tension in the cables andthe rope is directed downwa..

  Determine the coefficient of statics friction between

A hawser is wrapped two full times around a bollard. by exerting an 80 pound force on the free end of the hawser a dockworker can resist a force of 5000 on the other end of the hawser.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd