When finding the projection of p onto q what do you do

Assignment Help Civil Engineering
Reference no: EM13562681

1.The instrument used to measure a change in temperature . Bars AB and CD are made of A-36 steel and 2014-T6 aluminum alloy,respectively. When the temperature is at 75degreeF, ACE is in the horizontal position. Determine the vertical displacement of the pointer at E when the temperature rises to 150dwgreeF. ?

2.Force P is directed from point A(5,10,3) towards point B(1,-2,5) and has a magnitude of 15N. Vector Q=6i+2j-5k. When finding the projection of P onto Q what do you do with the 15N?

Reference no: EM13562681

Questions Cloud

Determine the coliform concentration at the beach : An ocean outfall diffuser that discharges treated wastewater into the Pacific Ocean is 500m from a public beach. The wastewater contains 105 coliform bacteria per milliliter. The wastewater discharge flow rate is 0.3 m3/s. The coliform first order de..
Find a liquid to be used in the towing tank that allows both : A 1:40 scale model of a ship is tested in a towing tank. Prototype operates in seawater at 60 F. Find a liquid to be used in the towing tank that allows both Froude and Reynolds scaling for the model and the prototype.
Determine the allowable stress design reference : Determine the Allowable Stress Design (ASD) reference and adjusted design values for the following members and loading conditions. All members are No. 2 Hem-Fir and are fully braced to prevent lateral-torsional buckling. Bending occurs about the stro..
Determine the magnitude and coordinate direction angles : If the coordinate direction angles for F3 are a=120degrees, b=45degrees, y=60degrees, determine the magnitude and coordinate direction angles of the resultant force acting on the eyebolt.
When finding the projection of p onto q what do you do : Force P is directed from point A(5,10,3) towards point B(1,-2,5) and has a magnitude of 15N. Vector Q=6i+2j-5k. When finding the projection of P onto Q what do you do with the 15N?
Compare the performance reactors/reactor combinations : Assume that a chemical reaction involving the removal of a given contaminant follows first order kinetics. The rate constant, k, is 0.5 hr-1. Compare the performance of the following reactors/reactor combinations. Provide your comments your results. ..
Design a curve for the highway by computing the radius : A horizontal curve is being designed for a new two-lane highway(12-ft lanes). The PI is at station 250 + 50, the design speed is 65 mi/h, and a maximum superelevation of 0.07 ft/ft is to be used
Determine the crest and sag vertical curves required : Two level sections of an east highway (G=0) are to be connected. Currently, the two sections of highway are seperated by a 4000-ft (horizontal distance), 2% grade. The westernmost section of highway is the higher of the two and is at elevation 100 ft..
What is the elevation of the pvt : An equal-tangent crest vertical curve is designed for 70 mi/hr. The high point is at elevation 1011.4 ft. The initial grade is +2% and the final grade is -1%. What is the elevation of the PVT? Solve this problem with the parabolic equation rather tha..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the station of pt of a horizontal curve

A horizontal curve is being designed around a pond with a tangent length of 1200 ft and central angle of 0.5211 radians. If the PI is at station 145 + 00, determine the station of PT.

  Find the discharge with an risk of being equaled or exceeded

he base-10 logs of the annual peak discharges in cfs for WY 1965-2010 have a mean of 3.678 and a standard deviation of 0.456. Assume that the probability distribution of the annual peak discharges is log-normal

  Determine the critical depth and critical velocity for flow

A trapezoidal channel has a bed width of 3.5 m and a side slope of 30 degrees from the horizontal. Determine the critical depth and the critical velocity for a flow of 22 cubic meters per second.

  Find range of values for probability of succeful takeovers

The current price of a company stock is $20.The company is a takeover target.If the takeover is successful.the company's stock price will increase to $30.If the takeover is unsuccessful.the stock price will drop to $12.

  A cast iron water main 14m long of 600 mm inside diameter

a cast iron water main 14m long of 600 mm inside diameter and 30 mm wall thickness runs full of water and is supported

  Determine the location of the neutral axis at failure

Given a reinforced concrete beam made with 3000psi concrete and grade 40 steel. The effective width is 12 inches, the beam depth is 24 inches and the reinforcement is 4#7 bars centered 2-1/2 inches from the bottom of the beam. The beam carries.

  Calculate the location of the effective depth on both sides

beam is 24 inch deep, the steel stirrup used is number 4,a 1 1/2 inch. concrete cover on both sides. Sketch how you will place the bars and calculate the location of the effective depth.

  Determine what is the present worth of benefit

A flood control project has a construction cost during the first year of $10 million, during the second year $6 million, and during the third year $2 million. It is completed at the end of the third year and thereafter incurs an annual operating c..

  A rod of steel is 20 m long at a temperature of 200c find

a rod of steel is 20 m long at a temperature of 200c. find the free expansion of the rod when the temperature is raised

  What is the undrained shear strenght-psf of the clay

an unconfined compression test was conducted on a cylindrical clay specimen with the following properties: Peak load at failure = 4.5lb, diameter of sample = 1.2 in.

  Find the component forces that the flange bolts must resist

Water at 20 degrees centrigrade in a 85 degree reducing bendis used in what is otherwise a continuous pipe. The systemoperating is 0.10 cubic meters per seconds

  An equal-tangent crest vertical curve has a 50 mih design

an equal-tangent crest vertical curve has a 50 mih design speed. the initial grade is 3. the high point is at station

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd