Dependencies between tasks

Assignment Help Management Theories
Reference no: EM13312298

Project Management Detailed Assignment: APA format, In-text citation; to include author name and year, as well as reference list; should be complete to include page numbers for the in-text citations or website used.

Scenario:

Although this product is being targeted at the home consumer, the sales department thinks there is great potential in the commercial market, and it should be pursued. You brought this issue to the project sponsor who, in turn, brought it to executive management. Management decided that this opportunity should be investigated as part of your project. It would like to see an opportunity assessment completed that defines the new markets, potential revenues, high-level sales and marketing strategy, and a 5-year financial business case with initial expenses clearly defined. They have agreed to provide additional resources (people, funding, and time) to create this new deliverable. You need to tell them how many people you will need to complete this deliverable within the next 6 weeks. You can assume that the people will be allocated to work on this deliverable a maximum of 20 hours per week.

Create a schedule focused on the creation of this new scope item. The schedule should include the following:

A list of tasks that will need to be completed

Dependencies between tasks

Total estimated effort to complete each task

Resource assignments

Start and end dates

The schedule should contain between 25 and 60 tasks/subtasks. Use Microsoft Project, Excel, Word, or any other appropriate tool to document your schedule. You will also need to define the team members you will need. For each team member you will need, create a bulleted list of skills/expertise he or she must have to complete his or her assigned tasks.

Reference no: EM13312298

Questions Cloud

Design a voltage-divider network to supply the load : We have a 15-V source and a load that absorbs power and requires a current varying between 0 and 100mA. The voltage across the load must remain between 4.7 and 5.0 V for all values of load current
How to determine the amount of heat loss by the system : A closed rigid tank contains 2kg of saturated water vapor initially at temperature of 433K. Heat transfer occurs from the system and the pressure drops to 150kPa. Determine the amount of heat loss by the system.
Compute magnitude of the load that is necessary to produce : A brass alloy has a yield strength of 280 MPa, a tensile strength of 390 MPa, and an elastic modulus of 105 GPa. A cylindrical specimen of this alloy 12.7 mm in diameter and 250 mm long is stressed in tension and found to elongate 7.6 mm.
Calculate the initial acceleration of the system : A 2.85 kg object is held in place on an inclined plane that makes an angle of 40 degrees with the horizontal. Calculate the initial acceleration of the system
Dependencies between tasks : Dependencies between tasks
Determine the percentage of the flow through the pipe : A pipe network in the form of a cube is made with twelve identical pipes. Each pipe forms an edge of the cube. If the entire inflow and outflow occurs at two adjacent corners, determine the percentage of the flow
Explain what is the total pressure of the gas in the flask : (NH4)2Cr2O7(s) ? N2(g) + 4 H2O(g) + Cr2O3(s) If 0.95 g of ammonium dichromate is used and the gases from this reaction are trapped in a 15.0 L flask at 23 °C, what is the total pressure of the gas in the flask. What are the partial pressures of N2..
Find the minimum rope tension required to get sled moving : A heavy sled is being pulled by two people. The coefficient of static friction between the sled and the ground is %u03BCs = 0.579, find the minimum rope tension required to get the sled moving
Calculate the distance upstream from the point of entry : A clean-earth channel, for which n=0.020, is 6m wide and lies on a slope of 0.005236. Water flows at 30m3/s through the channel and enters a reservoir. The water depth in the channel, just before the entry to reservoir, is 3m.

Reviews

Write a Review

Management Theories Questions & Answers

  Time and materials contracts always involves deceit

Buying-in on time and materials contracts always involves deceit, and I would consider that to always be unethical. When the cost of a project can be reasonably estimated, providing a lower estimate to a customer is clearly wrong,

  Interrogating technology sustinability

Interrogating technology:sustinability, environment and social change

  An indication of the relevant secondary literature

Outline of the research question, an indication of the relevant secondary literature and a description of the proposed research methods.

  Case study: equip hire

Make an individual report outlining the information systems recommended for the case study business

  International labour mobility and its effect on countries

International labour mobility and its effect on countries

  Distinguish between management and leadership

Distinguish between management and leadership. Explain roles and responsibilities that organizational managers and leaders play in creating and maintaining healthy organizational culture.

  Explain porter’s five forces model

IFSM 300  :  Explain Porter’s Five Forces Model and how Bill can use it to analyze his current business and his expansion.  Be sure to address each of the 5 forces and explain to Bill what they mean for his business.

  Environmental management

Environmental management

  Discuss the pros and cons of outsourcing

Discuss the Pros and Cons of outsourcing.

  Why do many managers act like control freaks

What does it have to do with control? Why do many managers act like control freaks? Why do many managers micromanage so much? Why are many managers reluctant to take the actions necessary to correct deviations?

  Large portion of their interests in dacca shares

Dracca's Senior Vice President of Sales, Bob Marley, and one of his sales representatives, Bill Farian, were on a conference call and learned that Dracca's new line of high chairs was going to be recalled the next day. During the call, Farian stated,..

  Measuring customer satisfaction paper

Measuring Customer Satisfaction Paper

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd