Q1.

Table 1 indicates the sequence and interdependence of the 10 activities (A - K) which together are required to develop a bespoke system. The durations (in weeks) of each of the activities are given in the table

Activity

Description

Duration (wks)

Precedence

A

Requirement Gathering

27

-

B

Business Analysis

24

-

C

Systems Analysis

21

-

D

Coding

21

A

E

Unit Test

22

B

F

Module Testing

27

C

G

Systems Testing

22

F

H

User Acceptance Testing

22

G,E

J

Implementation

22

H

K

Handover

23

D, J

(a) Construct a network diagram identifying the following:

i. Earliest Start Time(EST)
ii. Latest Finish Time (LFT)
iii. Total Float on each activities D, F & J
iv. Critical Path for the project

b) Assume that there is a delay of 3 weeks in completing activityH. Analyseone action that the Operations Manager could take to avoid exceeding the current length of the critical path.

Q2.

The resource-based view of the firm is one of the most influential current theories in operations strategy (Slack, 2007). Critically evaluate and argue how firms' should consider resource based view during the location selection process?

Differentiate and accurately distinguish between the need for organised interaction between the role of design and management within operations strategy.

Word count:1500

Reference no: EM135245

Questions Cloud

What is the magnitude of the runners total displacement : What is the magnitude of the runner's total displacement . What is the phase difference between the two waves next they reach the observer.
Prepare a powerpoint presentation on stakeholders : You are a high level manager who has been asked to show a PowerPoint Presentation to your employees on the ideas of stakeholders and corporate social responsibility.
What is the total mass of the reagents : What is the total mass of the reagents used in the combustion throughout the 30 days . The ball makes 17 oscillations in 16 seconds. What is it the mass of the ball.
What is the minimum distance from the slits to the screen : Suppose that the light is incident at right angles to the film. what is the minimum distance from the slits to the screen when 580 nm light is used.
Construct a network diagram : The resource-based view of the firm is one of the most influential current theories in operations strategy (Slack, 2007). Critically evaluate and argue how firms' should consider resource based view during the location selection process?
What should be the minimum initial speed of the dart : What should be the minimum initial speed of the dart so that combination makes a complete circular loop after the collision. find the minimum diameter of the raft that would prevent the diamond from being seen.
Discover an angular velocity of the weather vane : The flywheel of an engine has a moment of inertia 2.50 about its rotation axis. What constant torque is required to bring it up to the angular speed of 390 in a time of 8.50, starting from rest? What is its last kinetic energy . Discover an angular..
What least distance are they from each other : A fully loaded station wagon has a mass of 1690 kg. If each of its four tires is inflated to a gauge pressure of 211 kPa, what is the total tire area in contact with road . What least distance are they from each other? The angle might be too large ..
What is the height of the hill : What is the height of the hill . Find the coefficient of kinetic friction between flight bag and floor.

Reviews

Write a Review

Project Management Questions & Answers

  Evaluate the use of complex models of project risk

Critically analyse the concept of risk; discuss how it can be measured and ranked and outline how a project risk management strategy may be constructed.

  Formulate a reasonable investment policy statement

Formulate a reasonable Investment Policy Statement

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Role of project management in development

Write a paper which explore Results Based Management topic and how it plays the role of project management in development.

  Discuss five uses of a wbs in project management

The Work Breakdown Structure (WBS) subdivides the scope of work into manageable work packages that can be reliably estimated and assigned to a responsible person for completion. Discuss five uses of a WBS in Project Management

  The factors that influence the monitoring of project work

What are the activities that are related to the Management of Project Execution? (b) Monitoring is an aspect of Project Management performed throughout the Project. What are the factors that influence the monitoring and control of project work?

  Identify Risk in project management

Identify "Risk" in project management

  Explain meaning of contingency fee

Explain meaning of contingency fee.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Questionaire on project management

Questionaire on Project Management

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd