Case study - nibcos: big bang

Assignment Help Computer Networking
Reference no: EM13309568

ANALYZING A CASE STUDY

- SOMETIMES, SPECIFIC QUESTIONS ARE SET - ANSWER THESE
- OPEN CASE STUDY (NO SPECIFIC QUESTIONS)
- Brief Overview - where, when, key background information
- Key stakeholders
- Key Issues / problems
- Prioritise issues / problems
- Potential solutions / comment on solutions implemented
- What can we learn from the case / insights / conclusions

TYPE OF CASE

- In this course, primarily mini cases with a few more developed cases

- Mini cases often present a highly summarised, horizontal view of the organisation whereas full-blown cases often present a much more detailed vertical view

-‘Detective work' and reasonable presumptions are often necessary

- In class, we will often work in groups and some cases will be presented orally.

NIBCO, Inc., a mid-sized manufacturer of valves and pipe fittings headquartered in the U.S. with $460 million annual revenues, implemented SAP R/3 across its 10 plants and 4 new distribution centers with a Big Bang approach in December 1997. NIBCO management agreed with the Boston Consulting Group recommendation to "cut loose" from its existing legacy systems and replace them with common, integrated systems for finance, materials management, production, and sales/distribution, such as offered in the ERP packages of major vendors by the second half of the 1990s. However, the company leaders chose not to heed the advice of their consultants, or the current trade press, about taking a slower, phased-in approach. Instead, they developed plans for a Big Bang implementation of all modules (except HR) with a $17 million budget and a project completion date 15 months later that allowed for only a 30-day grace period.

The project is led by a triad of NIBCO managers with primary accountabilities for business process, IT, and change management. The case describes the legacy IT environment, the ERP purchase and implementation partner choices, the selection and composition of what came to be called the TIGER team, the workspace design for the project team (TIGER den), the key issues addressed by each project sub-team, the incentive scheme, and the complexity added by a distribution center consolidation initiative that runs behind schedule. The case story ends shortly after the Go Live date, with the project leaders replaying their warnings to the executive team about initial dips in productivity and profits.

This case study can be used to demonstrate the tradeoffs between Big Bang versus slower ERP implementation approaches that allow time for organizational learning. Students can identify the technology and organizational risks associated with ERP projects in general, and Big Bang implementations in particular, and then assess how well NIBCO's leaders manage these risks over the life of the project. Specific examples of communications and training initiatives, including ways to achieve employee buy-in, are detailed in the case so that students can better understand change management practices in the context of a major system implementation.


Attachment:- Assignment.rar

Verified Expert

Reference no: EM13309568

Questions Cloud

Find the total charge on the negative side of the slab : An electrically neutral thin, square metal slab, measuring 6.00cm on a side is placed in a uniform external field that is perpendicular to its square area. What is the total charge on the negative side of the slab
Explain what is the concentration of n2o after 3 half-lives : For the first-order reaction, 2N2O---> 2N2 + O2, what is the concentration of N2O after 3 half-lives if 0.15 mol of N2) is initally placeed into in a 1.00-L reaction vessel
Light chains held together by disulfide bonds : Consist of 2 heavy chains & 2 light chains held together by disulfide bonds.
What is the incoming current : 1200 KVA TRANSFORMER CHANGES TEH INCOMING VOLTAGE FROM 1200 VOLTS TO 400 VOLTS. WHAT IS THE INCOMING CURRENT
Case study - nibcos: big bang : Demonstrate the tradeoffs between Big Bang versus slower ERP implementation approaches that allow time for organizational learning.
Explain how many ml of naoh are needed to react : How many mL of 0.425 M NaOH are needed to react completely with 25.0 mL of 0.250 M Fe Cl3 solution. FeCl3 aq + 3NaOH arrow to Fe(OH)3 aq +3NaCl aq
Seniority system violate title : Patricia Lorance is an hourly wage employee at the Montgomery Works AT&T electronics products plant. She had been employed there since the early 1970s and under union rules accrued seniority through her years of service at the plant
Compute the location of point where electric field is zero : Two charges, -2.2 microCoulombs and -4.8 microcoulombs, are located at (-0.65m, 0) and (0.65,0), respectively. compute the location of the point where the electric field is zero
Using demorgan law to solve the problem : Using DeMorgan's Law, give an equivalent function for the following: f-(xy2--1-xi,)(y2+w+g)

Reviews

Write a Review

Computer Networking Questions & Answers

  Sequential circuit with two inputs

Derive a sequential circuit with two inputs (S1 and S2) and one output (z) using D flip flops that will output z=1 if a S1=S2=0 is input, then a S1=S2=1 is input, then a S1=S2=0 is input.

  Arrangement of subnet masks

An organization has a class C network 200.1.1 and wishes to form subnets for four departments, with hosts as follows:

  Create state transition diagram that explains patient states

Create a state transition diagram that describes typical patient states and how they change based on specific actions and events.

  Explaining telecommunications asset life cycle model

Explain in scholarly detail role of telecommunications operations functions in Telecommunications Asset Life Cycle Model concept?

  Install the web server role via server manager

Role services installed by default and project enables you to install the Web Server role via Server Manager.

  Determine five companies that provide p2p file-sharing

Find five companies that provide P2P file-sharing services. For each company, what kind of files (that is, content) do they handle

  Describe available bandwidth as a function of n

Assume that N Ethernet stations, all trying to send at same time, need N/2 slot times to sort out who transmits next. Describe available bandwidth as function of N.

  How many bits delivered to network-layer ptotocol

The destination network has a maximum packet size of 1240 bits. How many bits,including headers,are delivered to the network-layer ptotocol at the destination?

  Describe the network management software components

Describe the network management software components. Side server components, middleware components and northbound interface and explain the elements and capabilities of a fault, configuration, accounting, performance, and security server

  Probability of given frame of additional frames

Show that the probability q that a given frame is not asked before n-1 additional frames have been sent (i.e., the window is exhausted) is q = (1+n)2-n.

  Expanding the network connected to a single hub

Suppose computers on your home network are connected to a single hub (a), but now you need to expand the network.

  Explain build a system or application in-house

"IT and technical organizations often assume that they can build a system or application in-house, in lieu of packaged products, either commercial or open source. Does this mean it is better to build it yourself? What should one do?"

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd