WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT, Civil Engineering

Two crops are grown on land of 20ha.The cost of raising crop 1 is 3unit/ha, while for crop 2 it is 1 unit/ha.The benefit from crop 1 is 5unit/ha and from crop 2, it is 2 unit/ha. A total of 300 units of money is available for raising both crops. What should be the the cropping plan inorder to maximize the total net benefits?
Posted Date: 7/4/2012 10:42:21 AM | Location : United States







Related Discussions:- WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT, Assignment Help, Ask Question on WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT, Get Answer, Expert's Help, WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT Discussions

Write discussion on WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT
Your posts are moderated
Related Questions
what are the problems in traditional marine pilling system of steel tubular pile with concrete infill

Recognize the losses of prestress Recognising the losses of prestress which take place after the prestressing OF concrete structural elements, it is to be appreciated that pres

difference between compass suveying and chain surveying

I want to do project using ul design directory

Road Location in Dune Areas: The following principle should be observed in locating a road in dune areas : (a) Align a road where sand is covered by vegetation. (b) Sel

Tack coat - emulsified asphalts vs. cutback asphalts Emulsified asphalt is a suspension of asphalt in water by employing an emulsifying agent that imposes an electric charge o

Q. What is Diamond Crossing? Diamond Crossing is provided when two tracks cross each other either of the same gauge or of different gauges. It consists of two acute crossing (

Question What is main difference between direct circulation drilling and reverse circulation drilling? Answer In straight circulation drilling and reverse circulati

Define the Coefficient of Permeability: (K) A measurement of the ability of the soil or an aquifer for the movement of water through it. Also termed "hydraulic conductivity", C

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft