Calculate the Benefit-Cost Ratio for Municipal Government Project

With interest at 10%, the benefit-cost ratio for this municipal government project is most nearly:

  Initial cost                                                                          $200,000

  Additional costs at end of years 1 & 2                                 $30,000/yr

  Benefits at end of years 1 & 2                                            $0

  Annual benefits from year's 3 to 10                                     $90,000/yr

Solution:

PW Cost   = $200,000 + $30,000 (P/A, 10%, 2)

    = $200,000 + $30,000 (1.736)

    = $252,080

486_Calculate Benefit Cost Ratio for Government Project.png

PW Benefits = $90,000 (P/A, 10%, 8) (P/F, 10%, 2)     

    = $90,000 (5.335) (0.8264)     

    = $396,800

B/C = $396,800/$252,080 = 1.574


Related Discussions:- Calculate benefit cost ratio for government project

Define abrasion of steel structures - inspection of bridge, Define Abrasion...

Define Abrasion of steel structures? Abrasion of steel structures can generally be recognised by a worn, smooth, polished appearance of the surface.  Abrasion is caused by cont

Estimation of loading carrying capacity, Question While designing mini...

Question While designing mini-piles , should strength of grout be disused during estimation of loading carrying capacity? Answer While designing min-piles, there will

Material of steel tendons, Material of steel tendons The material of s...

Material of steel tendons The material of steel tendons also must be of a high strength. Tendons should possess required material and geometrical properties so that a desired

Significance of tailwater level in culverts, Significance of tailwater leve...

Significance of tailwater level in culverts Headwater level and tailwater level of culverts are significant parameters in hydraulic design. Headwater level can't be set too la

SETTLEMENT OF SOIL AND BRACING OF RETAINING WALL OF BASEMENT, STRUCTYRE IS ...

STRUCTYRE IS HAVING BASEMENT JUST WITH THE SIDE OF FOUNDATION WHICH CAUSED SETTLEMENT AND CRACKS IN THE STRUCTURES

Ranging, describe reciprocal ranging

describe reciprocal ranging

Water control for sheet pile walls, Q. Water control for sheet pile walls? ...

Q. Water control for sheet pile walls? Ground water flow into excavations constructed by sheet pile walls must be minimized in order to save the cost of the provision of pumpin

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

What do you mean by geotextile filter, Q. What do you mean by Geotextile fi...

Q. What do you mean by Geotextile filter? Geosynthetics is a collective term applied to thin, flexible sheets incorporated in or about soil to enhance its engineering performan

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd