solid mensuration, Civil Engineering

Assignment Help:
the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangle

Related Discussions:- solid mensuration

What do you mean by manhole loss, Q. What do you mean by Manhole loss? ...

Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str

Define npdes sampling requirements, Define NPDES Sampling Requirements? ...

Define NPDES Sampling Requirements? The sampling needs under NPDES are given at 40 CFR Part 122, as part of the needs for applying for an NPDES discharge allow. The needs are b

Product layout, Product Layout: Imagine a factory manufactures taps, d...

Product Layout: Imagine a factory manufactures taps, drills, reamers and cutters. The production of each of these items needs different machines which may be placed in differe

Urban transport systems, Urban Transport Systems: Urban Transport P...

Urban Transport Systems: Urban Transport Problem Rapid urbanisation is taking place in India. The current urban population proportion of 28 per cent may reach 40 per

Determine the soil shrinkage, Soil at a borrow area has a total unit weight...

Soil at a borrow area has a total unit weight of 120-PCF and a water content of 15 percent.  The soil from the borrow area will be used as structural fill and compacted to an avera

Structural drawing, Overview   A structure is required to support a conv...

Overview   A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural s

Define electrical tool for underwater inspection of bridge, Define Electric...

Define Electrical tool for underwater inspection of bridge? Electrical equipment like Rebar Scanner for scanning of rebars; underwater sonic and ultrasonic equipment for observ

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Analysis of the two stage construction, A County is planning to build a new...

A County is planning to build a new roadway connector in the rapidly developing area of the county. The road can be built at a reduced capacity now for $30 million and can be widen

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd