describe how you would range a surveying line betwen two point wich are not entervisible?

Related Discussions:- survey 1

Rectangular panel inside a false work, Question In erection of false work, ...

Question In erection of false work, for a rectangular panel inside a false work would it be braced all along two diagonals ? Answer While a rectangular panel is focus to the

Reasons of ground heaving during pipe-jacking, Reasons of ground heaving du...

Reasons of ground heaving during pipe-jacking It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer mus

Surface-protecting fenders and energy-absorbing fenders, Question What ...

Question What is main difference in application of surface-protecting fenders and energy-absorbing fenders ? Answer Surface-protecting fenders are fenders that make

How to construct a reinforced concrete foundation, A clay layer 24 metres t...

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m 3 . Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundati

Pumping at joints in concrete carriageway, Q. Pumping at joints in concrete...

Q. Pumping at joints in concrete carriageway? Pumping at joints in concrete carriageway takes place in the presence of the below factors: (i)  Fine-grained subgrade (ii)

Types of pavements, Types of Pavements: On the basis of structural pe...

Types of Pavements: On the basis of structural performance of pavements, there are basically two types of pavements: (a) Flexible, and (b) Rigid. A flexible pavement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd