Helical reinforcement designed instead of regular links, Civil Engineering

Assignment Help:

Question
For column reinforcements, why is helical reinforcement sometimes designed instead of regular links with reasons?

Answer
The utilization of links for column designing in Britain is very well-liked. Except, in U.S.A. engineers have a propensity to use helical reinforcement in its place of regular links as helical reinforcement has probable benefit of protecting columns or piles against seismic loads. In addition, when columns reach failure state, concrete outside hoops breaks and falls off firstly, followed by eventual failure of entire columns. Peeling off of concrete outside helical reinforcement gives a warning signal earlier than sudden failure of columns as optional by G. P. Manning in 1924. In adding, it is capable of take up a higher working load than regular link reinforcement.

For example, helical reinforcement is adopted in designing of marine piles in Government piers.

 


Related Discussions:- Helical reinforcement designed instead of regular links

Dams, types of dams

types of dams

#title.roads., metal sizes required and adopted question #Minimum 100 words...

metal sizes required and adopted question #Minimum 100 words accepted#

Underwater problems in bridge construction, Q. Underwater problems in bridg...

Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding

Atomic weight of an atom is equal to, Atomic weight of an atom is equal to?...

Atomic weight of an atom is equal to? Answer: sum of the number of protons and neutrons.

Structural engg, how static and dynamic frames are works?

how static and dynamic frames are works?

Different type of stones, Different type of Stones Stones used for civi...

Different type of Stones Stones used for civil engineering works can be classified in the following 3 ways:    Geological    Physical    Chemical

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Cement, List the ingredients of cement And their functions

List the ingredients of cement And their functions

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd