Explain the purpose of embedding puddle flange, Civil Engineering

Assignment Help:

Purpose of embedding puddle flange inside the walls of closed valve chambers

When valves are closed to stop water flow in a pipeline, a thrust is produced along the direction of the pipeline. Henceforth, it is essential to restrain the valves at the time of closure to prevent it from moving in the thrust direction. If the closed valve is situated inside valve chambers, it is connected to a puddle flange embedded inside a wall of chamber. So the closed valves can be effectively restrained from the thrust action at the time of the closure of valves.


Related Discussions:- Explain the purpose of embedding puddle flange

Explain total dynamic head (tdh), Total Dynamic Head: (TDH) y-axis plo...

Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g       v 2 / 2g usually small

Haley''s formula in pile driving, Question What is major difference bet...

Question What is major difference between "hammer efficiency" and "coefficient of restitution" at what time using Haley's formula in pile driving?   Answer Hammer ef

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Syphon, what is the design of syphon

what is the design of syphon

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

#title., Ask question #Minimum 100 words accepted2812539076# you

Ask question #Minimum 100 words accepted2812539076# you

Postensioning in raft foundation, how can we post tension a raft foundation...

how can we post tension a raft foundation? what design procedure should we follow to post tension raft foundation in order to decrease the concrete and steel volume and increase th

Emulsified asphalts or cutback asphalts, Question Have to emulsified a...

Question Have to emulsified asphalts or cutback asphalts be selected as staple coat in bituminous road works? Answer Emulsified asphalt is a postponement of asphalt

How should reservoir floors be designed, Question In designing of servi...

Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd