Explain the purpose of embedding puddle flange, Civil Engineering

Assignment Help:

Purpose of embedding puddle flange inside the walls of closed valve chambers

When valves are closed to stop water flow in a pipeline, a thrust is produced along the direction of the pipeline. Henceforth, it is essential to restrain the valves at the time of closure to prevent it from moving in the thrust direction. If the closed valve is situated inside valve chambers, it is connected to a puddle flange embedded inside a wall of chamber. So the closed valves can be effectively restrained from the thrust action at the time of the closure of valves.


Related Discussions:- Explain the purpose of embedding puddle flange

Determine the percentage of sand, A certain soil has 99% by weight finer th...

A certain soil has 99% by weight finer than 1 mm, 80% finer than 0.1 mm, 25% finer than 0.01 mm, 8% finer than 0.001 mm. Draw the grain-size distribution curve and determine the pe

School building, from surveying to school building finish

from surveying to school building finish

Control reinforcement corrosion, Crack width limitation ( In many stand...

Crack width limitation ( In many standards and code of practice of numerous countries, allowable size of crack width is generally limited to less than 0.5mm for reinforced conc

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Zero energy building, This is our final year project can u suggest some tip...

This is our final year project can u suggest some tips to do well...

Incremental launching mode of bridge construction, In i ncremental launchin...

In i ncremental launching mode of bridge construction, what are ways adopted to increase sufficient resistance of superstructure during launching practice?

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Survey, Procedures of graphical interpolation

Procedures of graphical interpolation

Design of steel structure, design acolumn spice for column sections SC 250 ...

design acolumn spice for column sections SC 250 and SC 220 carrying a load of 500 KN

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd