Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two mating spur gear with module pitch of 6.5 mm have 19 and 47 teeth of 20 degree pressure angle, and 6.5 mm addendum. Evaluate the number of pairs of teeth in contact and the angle turned through by the larger wheel for one pair of teeth in contact. Evaluate also the sliding velocity at the instant (a) Engagement condition (b) pitch point (c) Dis-engagement condition. When the pitch line velocity is 1.2 m/sec.
show that work and heat are path functions
I want complete information about the topic torsion of cylinder and torsion rigidity.if I have to make a project on this topic then how should I make it. Please help me sir.
Three basic types for microbial systems: Porous, nozzle and orifice Porous sparger Laboratory operation, usually constructed from sintered glass or metal. Disadvantages a
These are differentiated from hoists by the fact that the operator rides with the load. There are many different types of drives for such elevators but in general electric
Risks associated with identified hazards can be reduced to a reasonable level through the application of good design principles that are focused on integrating safety into the over
When was PDDI developed The PDDI interface was developed in connection with the ICAM project which was funded by the Air Force in order to improve the manufacturing methods in
Lifting machines: Basic definitions of the lifting machines and some lifting machines have been described. For each of these machines, derivation of the formulae for mechanica
Q. What is Slush moulding? Slush moulding is an excellent method for producing open-end objects. It is an inverse process of dipping, in which the inside of the mould is coated
what is strength of material?
Calculate the Cycle and Production Rate for Single-Machine Robotic Cell Determine the cycle and production rate for a single-machine robotic cell for an 8-hr shift if the syst
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd