Define the cost of shock transmission unit, Civil Engineering

Assignment Help:

Define the Cost of shock transmission unit?

There is a keen competition among the few STU manufacturers. For the second Bassein Creek Bridge, the average cost of two STUs of capacity 3100 KN was US $100,000 including supply at site, specified tests at UK, brackets holding down bolts airlifted from UK to the site and assistance of a qualified supervisor for the installation of STUs at the site.


Related Discussions:- Define the cost of shock transmission unit

Define hand tools for underwater inspection of bridge, Define Hand Tools fo...

Define Hand Tools for Underwater Inspection of Bridge? Hand tools involve scrapers, wire brushes, chain and wire ropes. Tools of this kind are suited in which cleaning is confi

Define pavement design - transportation, Define Pavement Design - Transport...

Define Pavement Design - Transportation 1. Asphalt surface a. Estimate Design Traffic b. Determine the Structural Number (SN) for the given traffic, roadway, and soil cha

Explain bridge selection criteria - underwater inspection, Explain the Brid...

Explain the Bridge Selection Criteria - Underwater inspection? Various factors influence the bridge selection criteria. As a minimum, all structures must receive routine underw

Why are steel plates inserted inside bearings, In designing of elastomeric ...

In designing of elastomeric bearings, why are steel plates inserted inside Bearings?

M, symbols of electrical layout

symbols of electrical layout

Test on specially moulded test piece, Test on specially moulded test piece ...

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact

Environment engineering assignment, Estimate the ground level NO concentrat...

Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd