Explain the Bridge Selection Criteria - Underwater inspection?
Various factors influence the bridge selection criteria. As a minimum, all structures must receive routine underwater inspection at intervals not to exceed five years. This is the maximum interval at which all underwater elements of a bridge, even if it is in sound condition, must be inspected. More frequent routine and in-depth inspections may be desirable for many structures and necessary for critical structures. Inspection frequency may be increased in those bridges where deterioration has been noticed during previous inspections. Factors to consider in establishing the inspection frequency and levels of inspection include:
- Age
- Type of construction material
- Configuration of the substructure
- Adjacent water features such as dams, dikes or marines
- Susceptibility of streambed materials to scour
- Maintenance history
- Saltwater environment
- Waterway pollution
- Damage due to water borne traffic, debris etc.
Determine the moment of inertia with respect to the x axis for the shaded area shown (Figure 2) . The dimension is a = 2.00m
how to calculate contour surveyed area
for zero air void line sr is
The Morison equation vs. diffraction analysis in determining wave force on piles The choice between Morison's equation and diffraction analysis in determining the wave forces o
Define Divers in a team for Underwater inspection of Bridge? One team of divers should have minimum three members. This is a requirement of safe working. The idea is while a mi
Loss of prestress due to creep of concrete Creep of concrete means time dependent deformation of concrete. Its effect depends upon the interval of time for which the member is
what is flush joint and confined joint in rcc spun pipes?
Tube levels explains
On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g
Enumerate the term - Failure Due to Crushing of Concrete Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd