Total volume of soil that excavated from the borrow area, Civil Engineering

Assignment Help:

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd3 of fill.  The borrow soil has an in-situ dry density of 94-PCF and a laboratory maximum dry density of 122.5-PCF.  The total volume of soil that must be excavated from the borrow area is most nearly:

Solution: The most common method of assessing the quality of field compaction is to calculate the Relative Compaction (RC) of the fill, defined as:

RC = 100 * (field dry density, PCF) / Laboratory maximum dry density (PCF)

Apply the equation using the given data:   

RC = 100 x 94-PCF / 122.5-PCF = 76.73%

Calculate the required volume of soil that must be excavated from the borrow area:  

(Required Fill) x (Compaction %) x (Relative Compaction)-1 = Excavated   Volume (borrow)

 10,000-yd3 of fill x (95%) x (76.73%)-1 = 12,380-yd3

 


Related Discussions:- Total volume of soil that excavated from the borrow area

Analysis and design Of Swimming Pool, Hi Sir I have a graduation project ...

Hi Sir I have a graduation project part (A) in this semester. I have chosen topic (Analysis and design of Swimming Pool). I got this project ready from friend so I want Presented

Loss of prestress due to elastic shortening, Loss of prestress due to elast...

Loss of prestress due to elastic shortening At the transfer of prestress, tensile stresses of tendons are transferred to concretc in the form of compressive stresses. Due to t

Mechanics of structure, distinush between determinant and indeterminant pla...

distinush between determinant and indeterminant plane trusses

Los angeles abrasion test, Los Angeles Abrasion Test: In which the agg...

Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated

Trigo, a pilot entering a bay on course

a pilot entering a bay on course

Explain the ion exchange water softening, Explain the Ion Exchange water So...

Explain the Ion Exchange water Softening Softening is usually done using a resin (natural or synthetic long chain chemical with a sodium ion attached). When water containing ha

Compression members, Compression Members: Compression members in steel...

Compression Members: Compression members in steel need special care in design. Steel possesses high strength in tension/compression; hence the sections are generally small com

Define deferred maintenance- underwater inspection of bridge, Define Deferr...

Define Deferred maintenance - underwater inspection of bridge? Many problems of the substructure can be traced to lack of any maintenance in time, which again can be due to lac

# bnm.l/j, what does oxymoron mean

what does oxymoron mean

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd