Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd3 of fill. The borrow soil has an in-situ dry density of 94-PCF and a laboratory maximum dry density of 122.5-PCF. The total volume of soil that must be excavated from the borrow area is most nearly:
Solution: The most common method of assessing the quality of field compaction is to calculate the Relative Compaction (RC) of the fill, defined as:
RC = 100 * (field dry density, PCF) / Laboratory maximum dry density (PCF)
Apply the equation using the given data:
RC = 100 x 94-PCF / 122.5-PCF = 76.73%
Calculate the required volume of soil that must be excavated from the borrow area:
(Required Fill) x (Compaction %) x (Relative Compaction)-1 = Excavated Volume (borrow)
10,000-yd3 of fill x (95%) x (76.73%)-1 = 12,380-yd3
Urban Transport Systems: Urban Transport Problem Rapid urbanisation is taking place in India. The current urban population proportion of 28 per cent may reach 40 per
Define Contaminants - underwater inspection of bridge? There are various substances that may be inadvertently incorporated into the concrete matrix (e.g. glass, coal, gypsum),
detail notes
define and explain various marine facilities
design of beams latteraly supported
What''re the procedures of contouring by graphical interpolation
If the standard deviation of an observation is ± 10-ft, the most probable error would be: The most probable error is defined as the error for which there are equal chances of t
Q. Direction of placing the main weight of reinforcement in concrete pavement? The reinforcement of concrete pavement is typically in the form of longmesh type. A road generall
Define Cyclic Force Transfer Test of Shock Transmission Unit? This test is specified to prove that the STU would function as intended during a seismic event. The STU shall be t
Explain with lime soda process?cold lime soda process&hot lime soda process and it''s equations?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd