Write short note on stock verification, Civil Engineering

Assignment Help:

Q. Write short note on Stock Verification?

It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordinates with the actual quantities hand. The Executive engineer should there fore arrange that approximately one sixth of the stock under each subordinate is verified by actual count each month so that the whole district or divisional stock is verified at least once every six months. The verification is in addition to the stock verification made by Accounts stock verifiers. All discrepancies should be enquired into. discrepancies if small i.e. not amounting in value to more than Rs 100 may after the executive Engineer has satisfied him self by investigation that no irregularity has occurred be adjusted to final heads under his orders. If the amount involved exceeds this amount the matter should be reported to the higher authorities for orders.


Related Discussions:- Write short note on stock verification

Simply-supported beam, A simply-supported beam (AB) with an overhang (BC) i...

A simply-supported beam (AB) with an overhang (BC) is illustrated in Figure 1(a), with the cross-sectional details given in Figure 1(b). The dead load comprises self weight only; f

Define categories of scaling-underwater inspection of bridge, Define the Ca...

Define the Categories of Scaling? Scaling is classified into following three categories: i. Light scale - loss of surface mortar up to 5 mm deep, with surface exposure of co

Abc, uses concrete slump test

uses concrete slump test

Colour code, in colour working drawing what are the colour code?

in colour working drawing what are the colour code?

#civil, what is whole circle barring

what is whole circle barring

Working from whole to part, explain the principle of working from whole to ...

explain the principle of working from whole to part, as used in surveying

Reinforced Concrete Design, design a 3-meter cantilever slab to carry a uni...

design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.

Equipments required for under water inspection of bridge, Define Equipments...

Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd