Q. Write short note on Stock Verification?
It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordinates with the actual quantities hand. The Executive engineer should there fore arrange that approximately one sixth of the stock under each subordinate is verified by actual count each month so that the whole district or divisional stock is verified at least once every six months. The verification is in addition to the stock verification made by Accounts stock verifiers. All discrepancies should be enquired into. discrepancies if small i.e. not amounting in value to more than Rs 100 may after the executive Engineer has satisfied him self by investigation that no irregularity has occurred be adjusted to final heads under his orders. If the amount involved exceeds this amount the matter should be reported to the higher authorities for orders.
Define the meaning of Grout - Concrete Grout should be made with any type of recommended cement and using water of a required quality. If very large size ducts are to be groute
contituents of paints
difference between moment and bending moment
Question For classic pile bents in marine piers, how can vertical loads related to horizontal capability of pile bents? Answer At first consider a pile bent with a top
Define Installation of Pot Bearings? In a sliding POT bearing, positive fixing to the main structure may not be required if the bearing is always subjected to adequate vertical
explain about single reinforced beams?
1feet
Explain the Operating Point - Pumping System Intersection of the characteristic curve and the system curve. This is the head and flow rate data for the pump "operation". The op
How does the knife edge load simulate the existing condition of the bridge structure?
Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd