What is long welded rail, Civil Engineering

Assignment Help:

Q. What is Long Welded Rail?

Long Welded Rail is a welded rail the central part of which dose not under go any longitudinal movement due to temperature variation, normally a length greater than 200 m on BG and 300 m. on MG should function as LWR. The maximum length of LWR has been prescribed as one kilometer under Indian condition.


Related Discussions:- What is long welded rail

List the factor that affect the permeability of a given soil, List the fact...

List the factors that affect the permeability of a given soil. Determine the precautions that should be taken so that satisfactory permeability data may be obtained. Explaining

Open chanel flow, A rectangular channel is 3 m in width and draws water fro...

A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake

Define the influence line-beam shear, Define the Influence line-beam shear?...

Define the Influence line-beam shear?   1.  Replace point of interest with a link element of nominal length.  If the point of interest is a reaction, place a hinge at that poin

Define recommendations for design of ptfe sliding bearing, Define Recommend...

Define Recommendations for Design of PTFE Sliding Bearing? Other Recommendations for Design of PTFE Sliding Bearing 1. Expansion bearings having sliding surfaces of PTFE sha

Building Drawing, Illustrate by mean of single line drawing the difference ...

Illustrate by mean of single line drawing the difference between couple truss and couple close truss

Project data , finding the mean ,mode and mediam

finding the mean ,mode and mediam

Dissimilarities between pipe culverts and box culverts?, Question What are ...

Question What are main dissimilarities in applications between pipe culverts and box culverts ? Answer Essentially, culvert resources covered hydraulic structure that conveys fl

Soils, how to classify soils materials

how to classify soils materials

How can a temporary diversion to laid, Q. How can a temporary diversion to ...

Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd