Explain the tertiary treatment for wastewater, Civil Engineering

Assignment Help:

Explain the Tertiary Treatment for Wastewater

Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water bodies), then additional treatment (biological and/or chemical treatment followed by filtration) known as tertiary treatment may be used.

Typical Standards: 10 mg/l BOD5, 10 mg/l suspended solids, 1 mg/l Phosphorous (for effluent discharges into great lakes)


Related Discussions:- Explain the tertiary treatment for wastewater

Cement bag question., composition of cement in cover bag should be written ...

composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?

Determine the soil shrinkage, Soil at a borrow area has a total unit weight...

Soil at a borrow area has a total unit weight of 120-PCF and a water content of 15 percent.  The soil from the borrow area will be used as structural fill and compacted to an avera

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

Slope, how to calculate a slope

how to calculate a slope

Heat transfer, Three mechanisms: 1) Conduction - occurs in solids and st...

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its

Diferential equations, show that Y = 4e2x - 2e-3x is a solution of initia...

show that Y = 4e2x - 2e-3x is a solution of initial-value problem (d2y)/(dx2)+ (dy)/(dx) - 6y=0 ; y(0)=6 ; y’(0)=2 . is Y = 2e2x - 4e-3x also a solution of this proble

Survey, underground installations

underground installations

Evaluate the length of guide bund, Q. Evaluate the Length of guide bund? ...

Q. Evaluate the Length of guide bund? For encouraging axial flow through the bridge, upstream length of guide bund may be kept 1.0 to 1.5 times the bridge length and downstream

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd