Enumerate the Variation in tendon stress

In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons stretch by the same amount and same prestress is produced in them. But practically, stresses in them may be different. 


Related Discussions:- Enumerate the variation in tendon stress

Energy dissipation at outlets - typical drainage outlet, Q. Energy dissipat...

Q. Energy dissipation at outlets - typical drainage outlet? Flow velocity at outlets is generally high. Without proper control of this energy, subsequent bank erosion can resu

Why we need a high strength concrete in prestressing, Why we need a high st...

Why we need a high strength concrete in prestressing There is another aspect to why we need a high strength concrete in prestressing. Prestressed concrete is subjected to high

Reverse and direct circulation drill drilling in piling, Q. Reverse and dir...

Q. Reverse and direct circulation drill drilling in piling? For reverse circulation drilling and direct circulation drilling, major difference in drilling method is connected t

Formation of pedestrian level winds around buildings, Q. Formation of pedes...

Q. Formation of pedestrian level winds around buildings? When a building blocks the wind blowing across it, part of the wind will escape over the top of the building. Some will

Location of construction joints, Q. Location of construction joints? Co...

Q. Location of construction joints? Construction joints are generally required in construction works since there is limited supply of fresh concrete in concrete batching plants

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Determine the basic concepts of prestressing, Determine the Basic Concepts...

Determine the Basic Concepts  of Prestressing In the year 1904, Freyssinet tried to introduce prestresses in concrete to resist stresses developed due to external loads. Later,

Construction material, 4. Calculate the loose volume of material needed to ...

4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd