What is imp rest stores, Civil Engineering

Assignment Help:

Q. What is Imp rest Stores?

Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should with the exception of consumable stores such as cotton waste, jute, oil and grease be treated as imp rest stores so long as they are under the control of the authority in charge of the executive unit. All such stores should be borne on an emprest account to be maintained by the departmental subordinate in charge of the stores and this form part of the stores and this form part of the stores balances of the railway.

The imprest with every subordinate should be fixed by the head of the department. The scale of imprest sanctioned for each subordinate should not be increased or decreased except by the authority who originally fixed the scale.

Material issued from in present stock should be recouped as soon after the issues as possible. The subordinate concerned may place requisitions for the recoupment of imprest stores direct on the authorized stores Depot.

No transfer of stores between imprest holders should be permitted except when stores are immediately required in a particular area in an emergency and are not available at the time with the imprest holder of that area. In such exceptional cases the stores required may be obtained from a neighbouring imprest holder who will then charge them off to the final head in his own account.


Related Discussions:- What is imp rest stores

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Strength of materials, distribution of shear stress in triangular section

distribution of shear stress in triangular section

Survey, Operation in chain surveying

Operation in chain surveying

Review of available records - underwater inspection, Review of available Re...

Review of available Records - Preparation for Underwater Inspection? Before taking up the underwater inspection, a detailed review of drawings and past report should be carried

Ghgh, Ask quhestion #Minimum 100 words accepted#

Ask quhestion #Minimum 100 words accepted#

Designing of watermain, Question In designing of watermain , regular p...

Question In designing of watermain , regular practice is to use supple iron for pipe size less than 600mm and to use steel for pipe size additional than 600mm. Give some speci

Surveying, how prepared for surveying?

how prepared for surveying?

Draw the variation in total stress, Draw the variation in total stress, eff...

Draw the variation in total stress, effective stress, and pour water pres- sure up to a depth of 6 m below ground level, given the following data. The water table is 2 m below grou

Cantilever support reactions, A cantilever has two couples: 1st(clockwise, ...

A cantilever has two couples: 1st(clockwise, 15kNm) placed at (1/3)L from support and 2nd (anti-clockwise, 10kNm) at (2/3)L from the support. What should be the reaction at the sup

Maintenance of concrete roads, Maintenance of Concrete Roads: The mai...

Maintenance of Concrete Roads: The main defects that show up in a concrete road are : (a) cracks (b) loss of sealant (c) spalling at joints (d) loss of texture

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd