Q. What is Imp rest Stores?

Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should with the exception of consumable stores such as cotton waste, jute, oil and grease be treated as imp rest stores so long as they are under the control of the authority in charge of the executive unit. All such stores should be borne on an emprest account to be maintained by the departmental subordinate in charge of the stores and this form part of the stores and this form part of the stores balances of the railway.

The imprest with every subordinate should be fixed by the head of the department. The scale of imprest sanctioned for each subordinate should not be increased or decreased except by the authority who originally fixed the scale.

Material issued from in present stock should be recouped as soon after the issues as possible. The subordinate concerned may place requisitions for the recoupment of imprest stores direct on the authorized stores Depot.

No transfer of stores between imprest holders should be permitted except when stores are immediately required in a particular area in an emergency and are not available at the time with the imprest holder of that area. In such exceptional cases the stores required may be obtained from a neighbouring imprest holder who will then charge them off to the final head in his own account.


Related Discussions:- What is imp rest stores

REQUIREMENT OF GOOD BUILDING STONE, HOW TO MAKE A GOOD BUILDING .? TELL ABO...

HOW TO MAKE A GOOD BUILDING .? TELL ABOUT SOME TIPS OF REQUIREMENT OF GOOD BUILDING STONE? AND SAY ABOUT CEMENT?

Precast concrete jacking pipes, Question While precast concrete jackin...

Question While precast concrete jacking pipes , from time to time grout holes are calculated inside these precast pipes. Give specific and key reasons? Answer Grout h

Physics, about lenses & mirrors for assignment

about lenses & mirrors for assignment

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Explain the shrink factor of soil, Explain the Shrink Factor of Soil In...

Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ

The effects of earthquake on spatial trusses, Evaluation of various reports...

Evaluation of various reports regarding the effects of earthquake on spatial trusses History and static In this section we aim to provide a summary report of what was happ

Determine the viscosity of water, A soil sample consists of particles rangi...

A soil sample consists of particles ranging in size from 0.6 mm to 0.02 mm. The average exact gravity of the particles is 2.66. Verify the time of settlement of the coarsest and fi

Large scale integration chips have between the components, Large scale int...

Large scale integration chips have between the  components? Answer : It is between 100 and 1000 components.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd