Haley''s formula in pile driving, Civil Engineering

Assignment Help:

Question

What is major difference between "hammer efficiency" and "coefficient of restitution" at what time using Haley's formula in pile driving?

 

Answer

Hammer effectiveness refers to ratio of kinetic energy of hammer to rate energy. In spirit, there are undoubtedly sure energy losses made by hammer itself prior to real impact on driven pile. For example, these losses can include misalignment of hammer, energy losses because of guiding friction, mistaken dropping height etc

Coefficient of compensation refers to a price indicating strain energy through collision regained after bodies reverted back to their unique shapes. If coefficient of restitution is like to unity, it means that collision is flexible and all energy has been returned after impact action. Thus, this is an index showing degree impact action in terms of flexibility.

 


Related Discussions:- Haley''s formula in pile driving

Some compound or metal vanishes under certain conditions is , Some compound...

Some compound or metal vanishes under certain conditions is? Answer: Due to Super conductivity some compound or metal vanishes

Emulsified asphalts or cutback asphalts, Question Have to emulsified a...

Question Have to emulsified asphalts or cutback asphalts be selected as staple coat in bituminous road works? Answer Emulsified asphalt is a postponement of asphalt

Define the net positive suction head, Define the Net Positive Suction Head ...

Define the Net Positive Suction Head All values in the equations are in units of feet.  Note: Only use values related to the suction side of the pump.   NPSHR = Net Posi

Fluid mechanics, Cd of venturimeter is more than that of orificemeter

Cd of venturimeter is more than that of orificemeter

Calculate the modulus of elasticity of concrete, Calculate the Modulus of e...

Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend

Determine the water-cement ratio, A concrete batch plant provided the Desig...

A concrete batch plant provided the Design Strength for the engineer's mix design to match the project's specification requirement for a 4000 psi Tremie pump mix.  The Water-cement

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Disparity between working stress and limit state approach, Question Wha...

Question What is key disparity between working stress approach and limit state approach ? Answer Working stress approach, service loads are used in whole plan and st

Surveying, Explain about reciprocal ranging

Explain about reciprocal ranging

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd