Determine the weight of one gallon of ferric chloride, Civil Engineering

Assignment Help:

The specific gravity of ferric chloride solution equals 1.3.  How much does one gallon of ferric chloride weigh?

 Solution:  ρferric chloride water = 1.3      

Conversions:  7.48 gal/ft3 of liquid

8.34 lb/gal of water = 81.12 lb/ft3

ρferric chloride = (1.3)(62.4 lb/ft3)

 (81.12 lb/ft3) / (7.48 gal/ft3) = 10.84 lb/gal   OR   (8.34 lb/gal) (1.3)


Related Discussions:- Determine the weight of one gallon of ferric chloride

Describe the geophysical profileof borings, Describe the Geophysical Profil...

Describe the Geophysical Profileof Borings The variation in the thickness of the soil stratum for engineering application is known as the geophysical profile. Figure 1.2 shows

Upper bound of indirect tensile strength, Question While designing rese...

Question While designing reservoirs, indirect tensile strength of the concrete mix is particular to be less than a specific value such as 2.8N/mm2 for potable water. Why ought

Determine concentration of total solids and volatile solids, The following ...

The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant.  The tests were performed using the standard methods. Dete

Approach span to its neighbouring inner spans, Question-Why is span length...

Question-Why is span length ratio of end span, approach span to its neighbouring inner spans typically about 0.75?   Answer-From aesthetic point of view, odd number of span

Design the 2-span continuous center, Design the 2-span continuous center T-...

Design the 2-span continuous center T-beam, B2, for the floor syetem shown below. The girders that the beam frames into are all 24" wide. Using fc'= 5 ksi, and fy = 60 ksi. The ser

Road survay, how many programmes in road survey by level matichine and ts?

how many programmes in road survey by level matichine and ts?

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

High temperature in laying bituminous pavement, High temperature in laying ...

High temperature in laying bituminous pavement Generally bituminous materials are also broadly categorized into two types viz bitumen McAdamsand hot-rolled asphalts. At the ti

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd