Water Sources and Requirements:

In this part, we have discussed:

(a) Basic concepts in planning of water supply schemes.

(b) Various types of water requirement.

(c) Sources of water.

Whenever water supply scheme is planned, it is essential to ascertain the requirement of water and the probable sources from which the requirement could be met. In case sufficient amount of water as per requirement is not available then either we curtail the requirement if possible and use the source available, or if requirement cannot be curtailed then more than one source is to be searched to supplement total water requirement. In Indian conditions, total water requirement may vary from place to place and climatic conditions besides the status and habit of the residents.

There are mainly two sources of water in Indian conditions, i.e. surface water and underground water. The ground water are generally clearer and free from impurities, while surface water contains suspended impurities and are more polluted. Water sources are selected based on the quantity and quality available, distance of the source from the city, general topography of the intervening area, elevation of the source of supply and total finance available.


Related Discussions:- Water sources and requirements

Find out load carrying capacity, Q.for ISMB200 having 6.70 m span simply su...

Q.for ISMB200 having 6.70 m span simply supported so find out load carrying capacity.

Approach span to its neighbouring inner spans, Question-Why is span length...

Question-Why is span length ratio of end span, approach span to its neighbouring inner spans typically about 0.75?   Answer-From aesthetic point of view, odd number of span

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

Main principle of post-grouting for mini-piles, Question What is main p...

Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g

Explain rcra and hswa - hazardous waste regulations, Explain RCRA and HSWA ...

Explain RCRA and HSWA - Hazardous Waste Regulations 1. In 1976, Congress passed the Resource Conservation and Recovery Act (RCRA) and directed EPA to establish hazardous waste

Explain the modular incinerators, Explain the Modular Incinerators 1. P...

Explain the Modular Incinerators 1. Prefabricated units with capacities of 4.5 to 107 tons of solid waste/day 2. Most use a system involving two combustion chambers.

Settlement due to deterioration, Q. Settlement due to Deterioration? Th...

Q. Settlement due to Deterioration? The deterioration of foundation concrete will result in the vicinity of sulphates, chlorides and chemically contaminated soils. Due to deter

Find a suitable slab thickness, The continuous one-way slab shown below is ...

The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd