Q. Purpose of reinforcement in concrete roads?
The major purposes of reinforcement in concrete roads are:
(i) To control the development and pattern of cracks in concrete pavement.
(ii) To decrease the spacing of joints. Generally joints and reinforcement in concrete structures are common design measures to cater for shrinkage and thermal movement. Therefore the inclusion of reinforcement enables the formation of tiny cracks in concrete pavement and this allows wider spacing of joints.
Actually the amount of reinforcement in concrete slab isn't substantial and its contribution to structural strength of roads isn't significant.
Fig: Road reinforcement
random rubble coursed, suare rubble coursed and uncoursed, polygonal walling, flint walling
State the process to calculate the Transmission Length It is the distance required at the end of a concrete member for developing the maximum tendon stress by bond.
Pressure at Any Point on the Surface of a Horizontal Plane Fluid pressure is the same at any point on the horizontal plane because: 1. The fluid specific weight is the sam
A 4-m-long, 6-cm-diameter cylinder placed normal to the flow is used to measure the velocity of an air stream. If a force of 50 N is measured, the air velocity is nearest (for air
Determine the support reactions for the truss shown below
AFor the given reinforced concrete moment frame school building determine; 1. The wind load acting on the middle truss in the roof truss assembly. 2. The net wind pressure (Wnet) o
I am a Civil Engg student. Why CBR Values determined only at 2.5 and 5 mm penetration ?.
IS CODES FOR BUILDING DESIGN The codes which help engineers to design buildings are following: 1. IS 456-2000. For the design of plain and reinforced concrete it is code
Why are undisturbed samples needed? Describe any one procedure of obtaining undisturbed samples for a multi-storeyed building project. For what purpose are geophysical methods u
30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 28% swell and shrinkage of 18%. The final volume of the compacted so
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd